Laserfiche WebLink
The City also proposes to construct the Bair Island Storm Drain Pump <br /> Starion adjacent to the proposed path. The new underground pumps,wet <br /> well,vault, enclosed emergency generator, and interconnecting pipelines <br /> would replace the e�sting pump stanon,which would be dernolished. The <br /> new pumps would be capable of dischaxging the 32.4 cfs flaw from the 22- <br /> acre drainage area during a 100-year storm event in,in compliance with City <br /> design criteria. The new p�unp station would discharge its flow through the <br /> exisring 24-inch lin�into Redwood Creek. <br /> Surrounding Land Uses: U.S. Highway 101, the waterfront development in the Bayfront areas <br /> east of the freeway including the One Marina development and an <br /> automobile dealership, and the commercial development on the west side of <br /> the freeway, open space,and recreational.uses. <br /> Othet Agencies Whose Approval is Required: Bay Area Air Quality Management District, <br /> California Department of Fish and Wildlife, Califomia De�artment of <br /> Transportation. �an Francisco Baq Regional Watex Quality Control Board, <br /> U.S. A�my Corps of Engineers <br />