My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso13 PC 13-24 2920 PC Reso-Adopt the Intitial Study MND - Undercrossing
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2013
>
Reso13 PC 13-24 2920 PC Reso-Adopt the Intitial Study MND - Undercrossing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2013 4:16:25 PM
Creation date
10/22/2013 4:11:38 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
10/15/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Z E�vironmentcal Analysi.r <br /> h)Expose people or suuctrsres to a srgrzrftca�t tisk oflass,injury ar death involvtr�g wildland <br /> fires, rncludtng where wildlartds are adjacerlt to ur8anized a.reas or ichere resJdetices are <br /> tntermixed with wildlands? " <br /> According to Figure PS-6 in the City General Plan, the project area is nat«nthin a Fire Hazard <br /> Severity Zone (City of Redwood City,2011). Therefore, the proposed project would not have any <br /> impacts from wildland fires. (No Impact) <br /> 2.9 HYDROLOGY AND WATER QUALITY <br /> The Location Hydtaulic Study Report in Appendix H sutrunarizes the floodplain management <br /> regularions,describes the exisung floodplain conditians in the praject area,evaluates potential <br /> flooding hazards from the pxoposed ptoject,and details canformance with the applicabie <br /> requixements. <br /> The Water Quality Report in Appendix I suininarizes the water quality regulations and guidelines, <br /> describes the quality of surface waters in the area, evaluates potential project impacts of�he project to <br /> water quality,and includes measures that will be implemented to maintain water quality objecrives. <br /> Average annual rainfall in the City is appro��ately 19.16 in. (Western Regional Climate Center, <br /> 2012).The project is adjacent to Redwood Creek,a 9.5-mile long�erennial srream that drains a <br /> watershed in the Emerald Lake Hiil area and dischaxges into San Francisco Bay at the Port of <br /> Redwoad City. The porrion of the creek at US 101 within the project area is tidally influenced. <br /> Based an the nearest gauge,the MHHW elevation is 7.4 feet abo�re sea level,and the Mean Lower <br /> Low Water (MLL� elevation is -0.$ feet (WRECO,2013). Higher and lower water levels occur in <br /> Redwood Creek,depending on ridal cycles and stormwatet events. According to the Flood Insurance <br /> Rate Map {FIRI1� 0301E,the project area would be located within a 100-year flood zone,Zone AE, <br /> with a base flood elevatian of 10 feet (FEMA,2012}. <br /> T'he San Francisco Bap Conse�vat�on and Development Coi�ni�nission (BCDC) and Cali£ornia <br /> Department of Water Resources (DWR),estima�e that continued sea level rise will increase the water <br /> level in the San Francisco Bap by 16 inches (1.3 feet) by 2050 and 55 inches (4.6 feet} by 2100 (DWR, <br /> 2011). <br /> The existing Bair Island Road ptzmp station at end of East Bayshore Road receives stormwater from <br /> a 22.25-acre atea on both sides of Bair Island Road and discharges to Redw�ood Creek through an <br /> e�sting 24-inch storrri drain pipe approxirnately 25 feet northeast of US 101 (KI'FF 2008). The <br /> e�sting pump station has a dischatge rate of 13.37 cfs,which is inadequate £ox the 32.40 cfs �eak <br /> flow from the 100-year storm. <br /> Redwood Creek is within the Santa Clara Valley Groundwater Basin and in tt�e San Mateo Plain <br /> Groundwater Basin (Basin Number 2-9.03). The National Resource Conservation Service Web Sail <br /> Survey for the project area indicates that that the depth of the groundwater table is more than 65 feet <br /> deep (`�RECO,2013}. CE&G detected groundwater at 2 to 4 feet during its baring. WREC� <br /> '-�r US 101 Pedestnan Undercro.r.ring and Bair <br /> I.rland Aaad Starrl?Draira Pump Stat�ara Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.