Laserfiche WebLink
2 Envir�nmental Analy�is <br /> IX. HYDROLOGYAND�ATER Potentiallp I.ess I�:�r: ~ I-�'=.` � �i:in �t� <br /> QUALITY--Would the project: Significant Significant Significant Impact <br /> Impact with Impact <br /> Mitiga.tion <br /> Incorporarion <br /> a) Vioiate any water quality standards or ❑ � � ❑ <br /> waste discharge requirements? <br /> b} Substanrially deplete gxoundwater ❑ ❑ � ❑ <br /> supplies or interfexe substanrially with <br /> groundwate�techarge such that there <br /> would be a net deficit in aguifer volume or <br /> a lowering of the local groundwater table <br /> level (e.g., the production rate of pre- <br /> e�sting nearby wells would drop to a level <br /> which would not support existing land <br /> uses ar planned uses for which permits <br /> have been granted)? <br /> c} Substantially alter the e�sting drainage ❑ ❑ � ❑ � <br /> pattern of the site or area,including <br /> through the altetation of the cou�se of a <br /> stxeam or river,in a mannex which would <br /> xesult in substanrial erosion or siltation on- <br /> or off-site? <br /> d) Substantially alter the existing drainage ❑ ❑ � � <br /> pattern of the site or area,including <br /> through the alteration of the course af a <br /> stream or river, or substanrially increase <br /> the rate or amount of surface runoff in a <br /> manner which would result in flooding on- <br /> or off-site? <br /> e) Create or contribute runoff water wlzich ❑ ❑ � ❑ <br /> would exceed the capacity of e�sting or <br /> planned stormwater ci�ainage systems or <br /> provide substantiai additional sources of <br /> polluted runoff? <br /> fl Otherwise substantiallp degrade water ❑ � � ❑ <br /> qu��y� <br /> 2-43 US 101 Pedc�strian Undercrnssang and Baar <br /> I.rlarad Aoad S�orira Drain Pump Station Project <br />