Laserfiche WebLink
�Enui�oonme�atalAraalysis <br /> water to the existing sanitary sewer system within in the project axea. Thu�,dewatering would not <br /> have any water quality impacts to surface or groundwaters in the axea. <br /> The stormwater discharges would comp�.y with the SMCWPPI' tequirements and the shared City of <br /> Redwood City and San Mateo County NPDES Permit No. CAS612008. '1'he discharges would be <br /> subject to e�sting monitoring and inspection requirements. <br /> The starmwater that collects in the new joint-use path would discharge through two new 18-inch <br /> pipes to Redwood Creek. <br /> The following rnitigation measures would reduce the potential impacts o£the project to water quality. <br /> Mitigation Measure HYD 1: Implementation of BMPs <br /> A Storm Water Pollurion Prevenrion Plan (Slx'PPP) shall be prepared for the project. The <br /> BMPs contained in the SWPPP shaFl be implemented, and the NPDES Pe�mit Campliance <br /> Checklist (see Appendix� to control and prevent the potential discha�ge of non-stormwater <br /> dischaYges and poAutants to Redwood Creek during construction shall be completed. The <br /> Contractar shall utilize measures such as secliment barriers, si�t fences, straw wattles, <br /> biodegradable fiber�olls, or i�ydraulic mulches to trap sediment in stormwater xunoff away <br /> during const�uction to pxevent the discharge of pollutants to Redwood Creek. The <br /> Contxactor shall revegetate the disturbed areas of landscaped vegetiatian along the cxeek <br /> banks with a hydroseed native plant mix for slope stabilizarion. The Contractor shall <br /> implement rock slope protecuon (RSP) on the cteek bank below the proposed 18-inch <br /> dtainage pipes' discharge points to prevent erosion along the creek bank. <br /> With the incorporarion of these measures,the impacts to watet quality would be reduced to less than <br /> significant levels. (Less thari Significant Impact with Mitigarion Incorporation) <br /> b)Substantially deplete groi.urdwater supplies or interfere substarltially with gtoundwater <br /> recharge such tCrat there would be a net deficit in aquifer volume ax a lawetiug of the local <br /> grarurdwater table level(e.g., the production rate ofpre-exrstir�grleatby wells wauld drop ta a <br /> level which would�ot support existrng land uses ar planried uses fot whrch permits have <br /> been granted)? <br /> Excavation for the 26-foot deep wet well at the teplacement pump station, trenching for the <br /> pipelines,and excavarian for the joint-use path would likely encounte�grout�dwater at levels belaw 2- <br /> 4 feet and need dewatering. The Ciry does not use grour�dwater for water supply wells. The requixed <br /> dewatering would affect gxoundwater levels in the immediate vicinity af the project,but would not <br /> have a substantial effect on groundwater supplies or interfere with graund�vater xecharge activities. <br /> (Less than Significarit Impact) <br /> 2-45 US �0� Pedestrian Undercrosssn�and Bair <br /> I'sland Road Stor7n Draan Prrmp Stataan I'rojec•t <br />