My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 URS Corporation
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 URS Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2016 5:25:52 PM
Creation date
10/23/2013 10:39:57 AM
Metadata
Fields
Template:
Agreement
Contractor Name
URS Corporation
PROJECT NAME
101/84 (Woodside Road) Interchange Project Approval & Environmental Document (PA&ED)
RMP File Number
304
Date
10/22/2013
MO Ref
13-184
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Subtask 7.1.2-Second Draft Project Report <br /> Based on Caltrans and local agency comments, a second Draft Project Report will be prepared. It <br /> is assumed that Caltrans will provide a final review. <br /> Subtask 7.1.3-Draft Project Report Approval <br /> Caltrans comments will be addressed and the DPR will be finalized and submitted for approval. <br /> Task 7.2 -Prepare Final Project Report <br /> The DPR is revised following circulation of the DED, consideration of public comments, and the <br /> selection of the Preferred Alternative. The Final Environmental Document (FED) is then <br /> approved by Caltrans to reach environmental clearance. At which point, Caltrans would approve <br /> the Project Report. <br /> Subtask 7.2.1 -First Project Report <br /> The DPR is revised following circulation of the DED, consideration of public comments, and the <br /> selection of the Preferred Alternative. First submittal of the PR is prepared incorporating <br /> comment responses and revisions to the document in response to comments. <br /> Subtask 7.2.2-Second Project Report <br /> Comments are received from Caltrans and other agencies and incorporated into the PR, which is <br /> then submitted for final review. <br /> Subtask 7.2.3-Project Report Approval <br /> Comments are received from Caltrans and other agencies and incorparated into the PR,which is <br /> then submitted to Caltrans for approval. <br /> Task 7-Deliverables <br /> �� Draft Project Report(lst Admin Draft, 2"d Admin Draft, and Public Circulation Draft) <br /> ❑ Final Project Report(lst Admin Final, 2"a Admin Final and Final) <br /> Task 8-Assess Utility Impacts <br /> Task 8.1 -Utility Coordination <br /> CONSULTANT will develop accurate existing utility mapping for the project area, locating <br /> utilities that potentially conflict with the proposed improvements, and developing relocation <br /> plans for conflicting utilities will be a critical task during project development. CONSULTANT <br /> will: <br /> ❑ Review and update as-built utility information <br /> ` Prepare existing utility maps <br /> -� Submit utility maps to affected utility owners <br /> ❑ Field verify utility locations with utility owners <br /> ❑ Identify potential utility conflicts, and <br /> ❑ Prepare Utility relocation Memorandum <br /> � Maintain a Utility Relocation Log <br /> ATTY/AGR/2013.164/URS PROFESSIONAL SERVICES AGR <br /> REV:10-15-13 VR <br /> Page 51 of 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.