Subtask 7.1.2-Second Draft Project Report <br /> Based on Caltrans and local agency comments, a second Draft Project Report will be prepared. It <br /> is assumed that Caltrans will provide a final review. <br /> Subtask 7.1.3-Draft Project Report Approval <br /> Caltrans comments will be addressed and the DPR will be finalized and submitted for approval. <br /> Task 7.2 -Prepare Final Project Report <br /> The DPR is revised following circulation of the DED, consideration of public comments, and the <br /> selection of the Preferred Alternative. The Final Environmental Document (FED) is then <br /> approved by Caltrans to reach environmental clearance. At which point, Caltrans would approve <br /> the Project Report. <br /> Subtask 7.2.1 -First Project Report <br /> The DPR is revised following circulation of the DED, consideration of public comments, and the <br /> selection of the Preferred Alternative. First submittal of the PR is prepared incorporating <br /> comment responses and revisions to the document in response to comments. <br /> Subtask 7.2.2-Second Project Report <br /> Comments are received from Caltrans and other agencies and incorporated into the PR, which is <br /> then submitted for final review. <br /> Subtask 7.2.3-Project Report Approval <br /> Comments are received from Caltrans and other agencies and incorparated into the PR,which is <br /> then submitted to Caltrans for approval. <br /> Task 7-Deliverables <br /> �� Draft Project Report(lst Admin Draft, 2"d Admin Draft, and Public Circulation Draft) <br /> ❑ Final Project Report(lst Admin Final, 2"a Admin Final and Final) <br /> Task 8-Assess Utility Impacts <br /> Task 8.1 -Utility Coordination <br /> CONSULTANT will develop accurate existing utility mapping for the project area, locating <br /> utilities that potentially conflict with the proposed improvements, and developing relocation <br /> plans for conflicting utilities will be a critical task during project development. CONSULTANT <br /> will: <br /> ❑ Review and update as-built utility information <br /> ` Prepare existing utility maps <br /> -� Submit utility maps to affected utility owners <br /> ❑ Field verify utility locations with utility owners <br /> ❑ Identify potential utility conflicts, and <br /> ❑ Prepare Utility relocation Memorandum <br /> � Maintain a Utility Relocation Log <br /> ATTY/AGR/2013.164/URS PROFESSIONAL SERVICES AGR <br /> REV:10-15-13 VR <br /> Page 51 of 78 <br />