My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 URS Corporation
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 URS Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2016 5:25:52 PM
Creation date
10/23/2013 10:39:57 AM
Metadata
Fields
Template:
Agreement
Contractor Name
URS Corporation
PROJECT NAME
101/84 (Woodside Road) Interchange Project Approval & Environmental Document (PA&ED)
RMP File Number
304
Date
10/22/2013
MO Ref
13-184
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
atabase listing of interested/concerned stakeholders 5 copies 1 Word or Excel, 1 <br /> PDF <br /> ommunity Outreach Summary Report 10 copies 1 Word, 1 PDF <br /> ask 11 -Value Analysis <br /> A Preliminary Analysis Memo 5 copies 1 Word, 1 PDF <br /> In addition to hard copy submittals, the CONSULTANT will be required to make electronic <br /> submittals of technical reports and drawings in Adobe Acrobat .pdf format or MS Word format, <br /> as directed by CITY. <br /> CONSULTANT work will be performed using the following software or converted to the <br /> following software: text documents will be MS Ward; drawings will be MicroStation CADD; <br /> estimates and tables will be Excel and project schedule will be MS Project. If files are <br /> converted,the conversions will be performed to the satisfaction of CITY's requirements. <br /> Assumptions <br /> This scope of services is limited by the following assumptions and as may be noted elsewhere. <br /> General <br /> ■ The CITY will be the lead agency for this contract with oversight by Caltrans and SMCTA. <br /> ■ PA/ED will be prepared in accordance with Caltrans procedures and standards. <br /> ■ All design work will conform to Caltrans standards, guidelines, manuals and policies in <br /> effect as of the date of the Notice to Proceed for the work. <br /> ■ All work will conform to applicable federal, state, and local codes and other regulatory <br /> requirements. <br /> Study Alternatives <br /> ■ The introduction of new study alternatives after environmental technical studies are complete <br /> is not included in the scope of services. <br /> ■ Airspace Study is not required. <br /> Project Limits <br /> ■ The project limits will be based on the limits shown on Figure 1 Site Map. <br /> Ma�ping <br /> ■ Aerial topographic mapping within the project limits described above will be prepared by <br /> CONSULTANT (Figure 1 Site Map). Topographic mapping outside of these limits is not <br /> included. <br /> Survev <br /> ■ All surveys will conform to the current CALTRANS Surveys Manual using 1983 NAD <br /> (Horizontal)and 1988 NAD(Vertical) datum. <br /> ATTY/AGR/2013.164/URS PROFESSIONAL SERVICES AGR <br /> REV:10-15-13 VR <br /> Page 62 of 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.