My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 URS Corporation
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 URS Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2016 5:25:52 PM
Creation date
10/23/2013 10:39:57 AM
Metadata
Fields
Template:
Agreement
Contractor Name
URS Corporation
PROJECT NAME
101/84 (Woodside Road) Interchange Project Approval & Environmental Document (PA&ED)
RMP File Number
304
Date
10/22/2013
MO Ref
13-184
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cultural Studies <br /> ■ Extended Phase I testing in support of the ASR is not included. <br /> ■ A maximum of eight buildings/structures will be assumed for historic resource evaluation <br /> report. <br /> Visual Impact Studies <br /> ■ A shadow study is not included. <br /> Communitv Impact Studies <br /> ■ A detailed Relocation Impact Assessment Report is not included. <br /> Communitv Outreach <br /> ■ CITY staff will handle the community meeting noticing and logistics — Newspaper <br /> announcements, e-mail blasts to community groups, securing the meeting facility <br /> ■ Interpretation services at meetings include Spanish only. <br /> Right of Way <br /> ■ State Right-of-Way Maps will be available from Caltrans. <br /> ■ Right-of-Way delineation will be based on as-built information. No field verification is <br /> proposed at this stage of design. � <br /> ■ Right of way hard copy and appraisal maps; temporary construction easements; and legal <br /> descriptions are not included in the scope of services. <br /> ■ Title reports will not be included. <br /> Units <br /> ■ All project deliverables will be prepared in English units. <br /> Draina�ydrology <br /> ■ CONSULTANT will not perform scour analysis for any watercourses in the project area. <br /> ■ Detailed floodplain analysis is not included <br /> Utilities <br /> ■ Utility relocations are for study alternatives only <br /> ■ Utility agreements will not be prepared <br /> Geotechnical <br /> ■ No subsurface exploration or laboratory testing will be performed. <br /> Pavement <br /> ■ Existing pavement does not require any analysis or testing. <br /> AlTY/AGR/2013.164/URS PROFESSIONAL SERVICES AGR <br /> REV:10-15-13 VR <br /> Page 64 of 7H <br />
The URL can be used to link to this page
Your browser does not support the video tag.