My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-11-18 Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-11-18 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2013 10:11:16 AM
Creation date
11/15/2013 3:48:02 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
11/18/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 74 <br /> 39. Red curb paint and "No Paricing" signage shall be instafled by the <br /> applicant as a part of this project at certain Iocations upon confirmation of Fire <br /> Department connections and fire hydrants. <br /> 40. Applicant shall comply with all City, State and Federal regulations, <br /> applicable to the Project, related to: fire and fife safety, ADA requirements, and all <br /> general building code regulations as per the Stafe Building Code as adopted and <br /> amended by the City of Redwood Ciky. <br /> 41. 7he applicant shall retain a Civil Engineer to prepare "as-builY' or <br /> record" drawings, and the drawings shall be submitted in AutoCad format. <br /> 42_ All internal garage drains shali be piumbed to the sanitary sewer, not the <br /> storm drain. <br /> 43. If fhe semi-subterranean garage will necessitate groundwater pumping <br /> into the sewer system, a Discharge fee wil( apply and a Discharge Permit will be <br /> required by South Bayside System Authority (SBSA} and the City of Redwood City. <br /> 44. Parking garage ramps shali be designed in conformance with Volume III <br /> of the Engineering Standards, and shall consider saiety and visibility of pedestrians <br /> to the satisfaction of the City Engineer. <br /> 45. Prior to removing any public parking spaces from public use during <br /> construction, where applicable, the applicant shall apply for Parking Meter Construction <br /> Zone Hoods per Municipal Code sections 20.175 through 20.183. Parking meter <br /> construction zone hoods shall be issued upon payment of a deposit of ten dollars <br /> ($10.00) per hood issued, refundable upon return of the hoods, and a nonrefundable <br /> fee of three dollars ($3.00) per day per hood issued. For those parking meters that <br /> will be temporarily removed during construction, the applicant shall be required to <br /> replace them afler project completion, per the direction of the City Engineer. <br /> 46. Prior to Final Map approval, the applicant shall provide a shared <br /> parking covenant (in a form acceptable to the Community Deveiopment Director and <br /> the City Attorney) providing the City with assurance that the shared parking <br /> obligations under the Downtown Precise P�an with respect to the project will be met <br /> and to assure that public parking supporting the downtown businesses wili be <br /> provided for the commerciai component of the project, at a minimum Monday <br /> through Friday, 8:00 a.m. to 5:00 p.m. The shared parking covenant sha1l be <br /> recorded against the property along with the Final Map. <br /> 47. The streets adjoining the project (Middlefield Road, Bradford Street, and <br /> JefFerson Avenue) shall receive an asphalt concrete overlay at the completion of <br /> improvements. Existing striping, markings, and legends shall be replaced in kind, or as <br /> modified by the City Engineer, <br /> ATTV/RES0.2900/PC RESO APPFOVING 525 MI�OLEFfEID TM,CONDO,PD&PC PERMI7 <br /> REV:08-29-13 VR <br /> P�ge 10 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.