My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-11-18 Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-11-18 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2013 10:11:16 AM
Creation date
11/15/2013 3:48:02 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
11/18/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 152 <br /> DOWNTOWN RWC RES, LLC <br /> November 7, 2013 <br /> Mr. Blake Lyon <br /> Planning Manager <br /> City of Redwood City <br /> 1017 Middlefield road <br /> Redwood City,CA 94063 <br /> RE: Indigo Project DPC2012-09, PD2013-08; Project Adjustments <br /> Dear Mr. Lyon: <br /> On September 19, 2013 an appeal was filed by 605 Middlefield, LLC(605)challenging the approvals granted <br /> by the Planning Commission on September 3, 2013. DOWNTOWN RWC RES, LLC(DRR) is hereby proposing a <br /> minor modification to the Planning Commission approved project in orderto address 605's concern,and <br /> thereby gaining a settlement of the appeal and their support of the Project. This memo is to describe that <br /> modification. <br /> The proposed modification to the project is to shift floors 4 through 10 of both the Bradford Tower(Tower 1) <br /> and the Jefferson Tower(Tower 2) north approximately 8.5 feet(See provided errata Sheets A2.4,A2.5,A2.6 <br /> &A3.0 to the previously approved Precise Plan for clarification). The building footprint and garage podium <br /> will remain in place.This shift will result in a three story edifice approximately 42 feet tall along the Bradford <br /> frontage (See provided errata Sheets A3.0,A3.2&A3.3 for clarification). The step back at the 4`"level will <br /> create an approximate 8.5'deep open space deck on top of the 3-story Bradford edifice(See provided errata <br /> Sheets A3.6&A3.7 for clarification). <br /> The Bradford Open Space deck will be approximately 1700 SQFT,to replace approximately 1020 SQFT of <br /> landscape area on the internal podium open space lost from the Tower 1 shift. The Bradford deck will be <br /> landscaped with potted planting material and maintained by the management company. <br /> The shift of the Jefferson Tower by 8.5'to the north does not have any material impacts to the Project <br /> configuration. <br /> The proposed modification is entirely consistent with the Downtown Precise Plan standards (See provided <br /> errata Sheet A5.1 for clarification). The net residential living space,gross building area, parking count and <br /> circulation shall remain effectively unchanged from that described to the Planning Commission. <br /> Sincerely, <br /> PeTer F. Dunne <br />
The URL can be used to link to this page
Your browser does not support the video tag.