My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-11-18 Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-11-18 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2013 10:11:16 AM
Creation date
11/15/2013 3:48:02 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
11/18/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 155 <br /> the leasing office will have direct access from public parking in the parking structure through <br /> back doors. A drive-up ATM is included in the parking structure and a walk-up ATM will be <br /> located at the front of the SMCU branch. <br /> The residential wrap units on the second and third floors as well as all of the tower units <br /> take their access through single and double loaded corridors leadingto the elevators and <br /> stairwells. All three parking levels and the podium are accessed through the elevator <br /> lobbies as well as at various points along the internal corridors. <br /> Mailbox rooms are located off each of the three ground floor lobbies. Trash chutes and <br /> recycling chutes in each of the three towers lead to bins within the trash rooms on the <br /> ground-floor of the parking garage. The bins are towed or pushed out the driveway entrances <br /> to curb-side on Middlefield and Jefferson on pick up days. <br /> Parking Management <br /> Parking for the project will be provided in a three story concrete parking structure set one <br /> level below grade and wrapped with residential and retail use on three sides. The ground <br /> floor level of the garage will be separated between retail parking and residential parking <br /> through an internal security fence. The basement level and the 2"d level will be 100% <br /> residential parking. The garage will be accessed by three driveways at the middle, ground <br /> floor level. Two of these driveways will take access off Jefferson, one serving residential <br /> parking and the other serving retail parking. The third driveway will take access off <br /> Middlefield and will serve only the residential parking. Right and left turns into and out of the <br /> garage will be allowed at all driveways. <br /> The retail parking will be shared parking, with the general public having access after <br /> business hours. The public parking will require payment through a ticket and gate system <br /> similar to other RWC parking lots. There will be approximately 52 shared retail spaces <br /> provided. Twelve will be assigned to the leasing office during business hours and 40 to <br /> the Credit Union. A 24 hour direct pedestrian access to the street from the retail parking <br /> will be provided. A drive through ATM will be installed within the retail portion of the <br /> parking garage. <br /> Residential parking will be provided on all three levels of the parking structure. Two <br /> controlled access driveways will serve the residential traffic, one on Jefferson Ave and one <br /> on Middlefield Road. Internal speed ramps at the northern end of the facility will provide <br /> vehicie access between parking leve�s. Size and distribution of parking spaces is detailed in <br /> Table 2 below. <br /> Parking spaces will be unbundled from the apartment units. Spaces will be leased to tenants <br /> on an as needed basis to satisfy the Precise Plan vision of"Just enough parking". Each space <br /> shall be numbered and assigned. Those residential wrap units that take access off haliways <br /> along the perimeter of each garage level shall be assigned spaces on their respective level. <br /> All spaces shall be assigned based in part on the type of vehicle being parked, with the more <br /> accessible spaces being reserved for the larger vehicles. Tandem spaces will be assigned <br /> together to the same apartment unit. The parking garage will be fitted with the necessary <br />
The URL can be used to link to this page
Your browser does not support the video tag.