My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-11-18 Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-11-18 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2013 10:11:16 AM
Creation date
11/15/2013 3:48:02 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
11/18/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 157 <br /> Table 2 -Proposed Parking <br /> Level Standard Tandem ADA Total Motorcycle Bicycles <br /> 8'6"x 18' 8'6" x 36' 9' x 18' Auto <br /> Basement 227 36 0 263 10 0 <br /> Level 1 Residential 63 30 9 102 10 112 <br /> Level 1 Retail 42 6 4 52 3 9 <br /> Level2 119 60 3 182 5 0 <br /> Total 451 132 16 599 25 res/3 retail 121 <br /> Public Outreach <br /> A Public Outreach Program shall target the downtown area and immediate neighbors to the project, <br /> as well as the Redwood City business community. <br /> The Developer shall reach out to the Redwood City Chamber of Commerce and present the project to <br /> the Chamber members. In addition, the Developer invited the Redwood City Downtown Business <br /> Association and all neighbors within a minimum 300' radius of the project perimeter to a public <br /> presentation held on July 25, 2013 at the Redwood City Public Library. City staff participated in this <br /> latter presentation. <br /> The Public Outreach presentations was scheduled after the project application was deemed complete, <br /> but sufficiently in advance of final design documents to allow time for feedback from the outreach <br /> meetings to be considered. <br /> Construction Schedule <br /> Site preparation will begin in Fall of 2013. Foundation construction should begin in January 2014. <br /> Project construction is anticipated to last +/- 24 months. First occupancy is expected in late 2015 — <br /> early 2016. <br />
The URL can be used to link to this page
Your browser does not support the video tag.