My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Southland Construction
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Southland Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2013 11:12:52 AM
Creation date
12/2/2013 11:12:50 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Southland Construction
PROJECT NAME
Renovation at Snadpiper Community Center 797 Redwood Shores Pkwy
RMP File Number
304.5
Date
11/27/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. Ceiling <br /> a. horizontal beams(up to and including 8' from floor) <br /> i. Varathane -Crystal clear Poly Urethane-satin finish—two(2)coats required <br /> ii. All wood surfaces to be cleaned and prepared prior to application of product <br /> b. Sound Panels <br /> i. Provide and install three(3)4'x8' tectum, or equal, sound panels PER beam <br /> (6 beams total= 18 panels) <br /> ii. Suspend from trusses with aircraft cable <br /> iii. Connect to aluminum frame with eyebolts <br /> 8. Doors <br /> a. Refinish wood doors <br /> i. Varathane Crystal clear Poly Urethane-satin finish-2 coats required <br /> ii. All wood surfaces to be cleaned and prepared prior to application of product <br /> b. Door casings <br /> i. All surfaces to be thoroughly sanded and cleaned prior to primer application <br /> ii. Primer-Rustoleum Sierra Performance#S30 Grip tec acrylic primer <br /> iii. Finish—Rustoleum Sierra Performance#S37 Metalm�—semi gloss DTM <br /> Acrylic Enamel—(color TBD) <br /> c. Smoke seal <br /> i. Remove all existing smoke seals <br /> ii. Install mechanically fastened smoke seals after painting is�e�e complete <br /> 9. Windows <br /> a. Window coverings-TBD <br /> Remodel of Kitchen Shall Include Items Listed Below at Nos. 1-7: <br /> 1. Cabinets <br /> i. Remove all existing cabinets and counters <br /> ii. Provide and install new cabinets at standard height- solid ply construction, <br /> adjustable shelves, euro-hinges, (Laminate product and color TBD) <br /> Page li ot 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.