My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-12-09 Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-12-09 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2013 5:11:54 PM
Creation date
12/5/2013 5:05:07 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
12/9/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4.1.C. - Page 18 <br /> EXHIBIT "A" <br /> SCOPE OF SERVICES <br /> Middlefield Road Underground Utility District 2011-1 Project <br /> Design Scope of Work <br /> PROJECT QESCRIPTIO�V: <br /> Consultant shall provide design and engineering services for the Middlefield Road Underground <br /> Utilities District 20�1-1 Project. �tte o6jectives af the Middlefield Road Ur�de€'ground Utili�ies District <br /> 2011-1 Project are ta rem�ve existing averhead utility structures; install facilities for supplying electric, <br /> co�nmunicatian, and similar services �nderground; and make stree�seape irrtprovements that increase <br /> pedestrian and bicyclist's mobility. The project area is defined as ihe length of Middlefield Road <br /> between Main Street and MacArthur A�enue. <br /> Far t�e first phase of t�is agreement, the Consultar�t shall specifitally pravide design and engineering <br /> services for this projec�to include aerial topography, utility surveying, legal description, and produetion <br /> of the Jaint Trench Intent Drawing. 7he Joint Trench Entent prawing shall show the City's preferred <br /> proposed utifity trench alignment and the street layout. The atfected utility cor�panies' (PG&E, AT&7, <br /> Comcast, Astound) will use these loint Trench lr�tent drawings to prepare their indi�idual utility desi�n <br /> far their underground facilities. Based on distussions with PG&E, their design will take up to two years <br /> ta cor�tplete(5ummer 2014). <br /> tJpan corr�pletion of the utility comparties design for their facilities, to the City may arr�end this <br /> � agreernent to include finalizing the tamposite joinfi trench drawings, preparing "Form B", finalizing the <br /> � streetscape design, and constructiort st�pport services. <br /> DESIGN: <br /> TA5K 1—AERIAL TOPOGRAPHY <br /> Consu{tant shall: <br /> 1. Set flight crosses for aerial tapography t�sing horizontal and vertical controls tied to City's 6asis <br /> of hearing and bench. <br /> beliverable: <br /> a. 1"=40'scale map of city right-of-way for distriet and streetscape improvements sE�alf be <br /> subrr�itted within five (5)weeks from Notice to Proceed (NTP). <br /> TASK 2—UNDERGROUND tJTiLlTY LOCATII�G AND MAPPIfVG <br /> Consultant shall: <br /> 1. Perform field survey to identify cfetectable subsurface 9r�terferences where project planning <br /> and construetion activities are proposed. <br /> 2. Proiae accessible storrn drains and sanitary sewer lines. <br /> 3. lnvestigate proposed boring locations and subsurface obs�r�etions. <br /> 4. Surface trace deteeted electrical lir�es w9th red spray paint, <br /> 5. Surface trace subs�rface f�at�res according to APWA eode. <br /> A7TYIAGR1201'�.1271DSA BELLECCE 11000D.DOC I' <br /> REV: 'I'{11611'1 '[0 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.