Laserfiche WebLink
( <br /> 4.1.C. - Page 19 <br /> 6. Open and inspect accessible vaults. <br /> 7. Prepare�ase map for intent drawings based on ground survey. <br /> Deli�erable: <br /> a. AutoCAp rnap shawing comrnur�ications, chilled water, gas (non pG&E}, high voltage electric, low <br /> voltage electric, sanitary sewer, steam, street lights, storrt� drain, dornestic water, lake water and <br /> recycled water. 5ervices are perforrned in accordance with "Underground Ser�ice Alert (USA) <br /> Procedures" and Common Ground Alliance's "Lacating and Marking Best Practices"Version�4.0. �he <br /> rnap will also show baring loeation lines, detectable utili#ies frarr� their originating vaul�s, potentially <br /> buried and abandoned conduits, and any significant findings from the field work shall be subt'rtitted <br /> five (5)weeks from N7P. Five (5) copies of t�e map and .dwg fife shall be submitted to the City. <br /> TASK 3—UNDERGROUN[�UTILITY DISTRiCT BOUhIDARY LEGA�DE5CRIPTION <br /> Consultant shall: <br /> 1. Prepare and update legal description based on a p6at map of district. <br /> beliverable: <br /> a. Narrati�e legal description stamped by a California License Land Sur�eyor sE�all be s�abmitted two (2) <br /> weefcs after I�TP. <br /> TA5K 4--JOINT TRENCH INTE�T DRAWINGS AND MEETINGS WtTH CITY AND UTILITY COMPANIES <br /> Consultant shall: <br /> 1, - Prepare record docum�nts. <br /> 2. Meet with utifity companies. <br /> 3. Prnvide noti#ication of rrieetings to City project rr�anagement and distribute rneeting <br /> minutes following each project meeting. <br /> 4. Prepare loint 7rench lntent brawings coordinated with City, AT&�, PG&�, Comcast and Astour�d to <br /> prepare Joint Trench Intent brawings. Cantractor shall conduct at least 1 ar�d as many as 3 field <br /> meetings wi�h each utility company and at least 3 independent site walks. <br /> 5. Prepare 1"=Z0' scale plans showing the preliminary loint Trench alignment aEong Middlefield Road <br /> between Main 5treet a€�d MacArthur Avenue. The Joint Trench will also extend onto the side streets <br /> of Mapfe,the JPB R#i tracks that cro55 Maple S�reet and Pennsylvania Ave, Cassia, Heller, Elrn, Beech, <br /> Cedar, Charter, Pine, 8uckeye, Spruce, Manzanita, Laurel, Willow, Chestnut, Fly€�n, and Douglas. <br /> Joint trench intent drawings will include City standard barder, north arrow, legend, stationing line, <br /> preliminary trer�ch aligntnent, proposed street crossings, prirt�ary and secondary preliminary trench <br /> alignment, existing utilities from Taslc 2, aerial topography from Tas�C 1,termination poles identified, <br /> preliminary locatians of riser poles, coneeptual loeations for #7 vatalts, #5 vaults, and secondary <br /> vaults, and other iterr�s typica! to loint 7reneh Intent brawings. �he backgrour�ds far the Joint <br /> Trench Intent Drawings shall include a conceptual (ayout of the streetscape sidewaiks for r�ference <br /> on1y. The scherr�atic laya�t shall nQt incl�de ar�y detaiied urban design and shall be for reference <br /> only. l"he basis for the bacicground curb lir�es shall be to show �f}-foot wide sicfewalks and bulb-outs <br /> as placeholc#ers. <br /> 5. Deliver draft Joint Trench Intent brawing prior to final drawing to City project management for <br /> camment. Contractor shall tab�late City corr�ments into a comr�ent-response rnatrix which shall be <br /> cornpleted and s�bmitted to City project management far approval. <br /> AT�YIAGR12011.127/DSA BELL�CCI 11000C}.I?OC <br /> REV: 111161'i 1 11 <br />