Laserfiche WebLink
4.1.C. - Page 20 <br /> �eliverable: <br /> a. �ield nates. <br /> b. Meeting min�tes. <br /> c. The Consultant shall prepare and submit six (6) full-size copies the draft Jaint �'rench Intent <br /> Drawing(95%)withir� six(6)weeks after NTP. <br /> d. The Consuitant shall prepare and subrnit to the City ten (10} fulf-size copies af the final loint <br /> Trench Intent Draw3ng suitable to the �arious utility catr�panies within 30 days after recei�9ng City <br /> staff's comments on the 95%draft intent drawing. <br /> e. Defiver final Jo�nt Trench 9ntent �rawing to the utility compa�ies. <br /> f. Co€�r�rr�ent-Response Matrix(Final lntent Drawing Comments from City Staff) <br /> Mark up(5%)of subcontractor's services represents Consultant's cost to manage s�bco�tractors. <br /> ATTYIAGW2011.1271DSA BELLECCI 110000.DOC <br /> REV: 1'1/16111 12 <br />