My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Cornerstone Structural Engineering Group SF, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Cornerstone Structural Engineering Group SF, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2013 4:28:23 PM
Creation date
12/9/2013 4:28:21 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Cornerstone Structural Engineering Group SF, Inc.
PROJECT NAME
Structural Engineering consultant for biox culvert construction loading Crossing 900.
RMP File Number
304.5
Date
12/9/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
16. Authori . The individuals executing this Agreement and the instruments referenced in it on <br /> behalf of Consultant each represent and warrant that they have the legal power, right and actual <br /> authority to bind Consultant to the terms and conditions of this Agreement. <br /> CITY: CITY OF REDWOOD CITY <br /> 1017 Middlefield Road <br /> Redwoo City, A 4063 <br /> By: <br /> Bill Ek r , Community Development Director <br /> TT <br /> "Ivia erlinden, City Clerk <br /> CO SULTANT� Cornerstone Structural Engineering Group SF, Inc. <br /> � 40 Federal Street <br /> San Francisco, CA 94107 <br /> .By. ..By. <br /> Printed Name: �s l. �� Z� Printed Name: <br /> Title: ���1�- "V l Title: <br /> If required by City, proper notarial acknowledgment of execution by Consultant must be attached. If a <br /> Corporation, Agreement must be signed by one corporate officer from each of the following two <br /> groups. <br /> *Group A **Group B. <br /> Chairman, Secretary, <br /> President,or Assistant Secretary, <br /> Vice-President CFO or Assistant Treasurer <br /> Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary <br /> under corporate seal empowering the officer(s)signing to bind the corporation. <br /> REV: i1-19-13 VR <br /> Page 3 of 5 <br /> ATTY/AGR.2013.233/Cornerstone Structural Engineering Group! Box Culvert- Crossing 900 <br />
The URL can be used to link to this page
Your browser does not support the video tag.