My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Moore, Iacofano and Goltsman, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Moore, Iacofano and Goltsman, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2013 2:51:32 PM
Creation date
12/17/2013 2:51:31 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Moore, Iacofano and Goltsman, Inc.
PROJECT NAME
Design Professional, Main St. Dog Agility Park Project Landscape Architecture Services
RMP File Number
304.5
Date
12/16/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a. Cover Sheet with General Notes (City's title sheet template) <br /> b. Existing Conditions Plan <br /> c. Demolition Plan and Tree Preservation Plan <br /> d. Grading Plan <br /> e. Layout Plan <br /> f. Detail Reference Plan (includes city standards details) <br /> g. Planting Plan <br /> h. Irrigation Plan and Details <br /> i. Utility and Drainage Plan and Details <br /> j. Electrical Plan <br /> k. Erosion Control Plan (City's SWPPP sheet) <br /> 3. Provide Specifications (Template provided by City) <br /> 4. Incorporate City Standard Notes, Details, Dates, and Specifications into P8�S <br /> 5. Meet with City as necessary for review of drawings and specifications <br /> Deliverables: <br /> 1. 95% PS&E (Plans, specifications and cost estimate) (PDF) and review with staff <br /> over the phone <br /> 2. 100% PS&E (PDF) submittal, review with staff at MIG offices <br /> 3. Bid Set-signed set, 24x36 size drawings on bond <br /> 4. Final Cost Estimate (PDF) <br /> 5. Bid set plans as CAD file, Specifications as word file and print ready <br /> TASK D - Construction Administration 8 Support for pog Agility Park <br /> Consultant shall: <br /> 1. Prepare addenda as needed <br /> 2. Review and approve submittals from the contractor <br /> 3. Answer RFI's from the contractor <br /> 4. Review change orders and recommend approval/denial of such <br /> 5. Attend two site observation visits <br /> 6. Review punch list of substantial completion <br /> TASK E—As-built Drawings for pog Agility Park <br /> Consultant shall: <br /> 1. Upon compietion of the construction and acceptance of the project, as-built <br /> plans will be drafted based on redline drawings provided by the Contractor as <br /> follows: <br /> a. One set of 24"x36" plans on Mylar <br /> b. One CD/DVD disk with as-built plans and specifications. CAD/PDF <br /> 2. Coordinate As-built plans with the sub-consultants <br /> SUBCONSULTANT FEE <br /> Consuitant shall invoice a 5%fee for the management of the sub-consultants not-to- <br /> exceed $1,285.00. <br /> REV:11-21-13 VR <br /> Page 12 of 14 <br /> ATTY/AG R.2013.234lM I G <br />
The URL can be used to link to this page
Your browser does not support the video tag.