My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Moore, Iacofano and Goltsman, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Moore, Iacofano and Goltsman, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2013 2:51:32 PM
Creation date
12/17/2013 2:51:31 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Moore, Iacofano and Goltsman, Inc.
PROJECT NAME
Design Professional, Main St. Dog Agility Park Project Landscape Architecture Services
RMP File Number
304.5
Date
12/16/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
j. Uplights at existing Elm Tree <br /> k. Drinking fountain with dog bowl <br /> I. Dog wash station <br /> m. Digging ditch <br /> n. Dog agility equipment <br /> o. New crosswalks and ramps <br /> p. Bollards at Beech St <br /> q. Repair or replace existing sidewalks <br /> r. New street trees in tree wells with grates and guards <br /> s. New pedestrian scale lighting <br /> t. New seating at Beech St. <br /> Deliverables: <br /> 1. Color Conceptual Plan (PDFj ready for print at 24"x36" <br /> TASK B - Design Development (DD) for pog Agility Park <br /> Consultant shall: <br /> 1. Develop 100% DD drawings with cost estimate (equivalent to 60%Construction <br /> Drawings) with the following sheets: <br /> a. Preliminary Cover Sheet (City's title sheet template) <br /> b. Existing Conditions Plan <br /> c. Demolition Plan and Tree Preservation Plan <br /> d. Preliminary Grading Plan <br /> e. Preliminary Utility Plan <br /> f. Preliminary Landscape Planting Plan (Zones 8� Plant List) <br /> g. Preliminary Irrigation Plan <br /> h. Preliminary Design Details <br /> i. Preliminary Lighting Layout <br /> j. Erosion Control Plan (City's SWPPP sheet) <br /> 2. Develop 60%specifications per city template <br /> 3. Field inspect existing irrigation system <br /> 4. Provide additional value engineering as required <br /> 5. Finalize approved plan <br /> 6. Attend one meeting with City at MIG offices <br /> Deliverables: <br /> 1. 100% DD drawings <br /> 2. 60%Specifications <br /> 3. Cost Estimate for City review & comment (PDF) <br /> 4. Irrigation Equipment Schedule <br /> TASK C - Construction Documentation (CD) for pog Agility Park <br /> Consultant shall: <br /> 1. Coordinate drawings with sub-consultants <br /> 2. Provide drawings that include: <br /> REV:11-21-13 VR <br /> Page 11 of 14 <br /> ATTY/AG R.2013.234/M I G <br />
The URL can be used to link to this page
Your browser does not support the video tag.