Laserfiche WebLink
7.1.F. - Page 2 <br /> The objectives of the final engineering design for the Walnut Street Interceptor Project <br /> include preparation of design drawing and specifications to solicit bids from general <br /> contractors. The scope of work includes: <br /> • Design of transition structures to provide connection points for existing and future <br /> collection system pipelines. <br /> • Coordinating and procurement of CalTrans permit for crossing US 101 freeway. <br /> • Design of trenchless crossing piping plan, site grading plan, and demolition plan <br /> ALTERNATIVES <br /> Council may choose not to approve the proposed agreement with Kennedy /Jenks <br /> Consultants and direct staff to find alternate means of completing the work, or modify <br /> the scope of work, or select other consultants. <br /> FISCAL IMPACT <br /> Funds for this project have been approved and appropriated in the budget for Fiscal <br /> Year 2013/14 — Sewer Fund Capital Projects, Walnut Street Interceptor Replacement <br /> which has an available balance of $3,721,268.71 as of October 31, 2013. <br /> ENVIRONMENTAL REVIEW <br /> This design services agreement does not constitute a project as defined by the <br /> California Environmental Quality Act. <br /> lib re <br /> JIMMY TAN, PE <br /> SENIOR CIVIL ENGINEER <br /> BILL EKERN <br /> COMMUNITY DEVELOPMENT DIRECTOR <br /> ROBERT B. BELL <br /> CITY MANAGER <br /> ATTACHMENTS <br /> 1. Project Location Map <br /> 2. Proposed Agreement between City of Redwood City and Kennedy /Jenks <br /> Consultants <br />