My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-01-13 Interview, Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-01-13 Interview, Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2014 8:33:06 AM
Creation date
1/9/2014 9:29:21 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
1/13/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
543
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.F. - Page 15 <br /> • Review and evaluation of conflicts between proposed Walnut Street Interceptor and <br /> SBSA's proposed 48 -inch force main improvements in Maple Street, <br /> • Review and evaluation of potential conflict with access and parking for the women's <br /> correctional facility across from the Maple Street Pump Station, <br /> • Review of existing 'soils data and development of an opinion regarding the suitability of <br /> soils for specific tunneling methods,(1.e open shield pipe jacking vs. microtunneling), <br /> • Review and evaluation of available lining systems for the new Walnut Street Interceptor <br /> pipe that can reduce corrosion extend the useful life of a concrete pipe desired for the <br /> crossing, and <br /> • Production of a Project Risk Register, which identifies risks and possible avoidance or <br /> mitigating measures to be incorporated into the final design. <br /> Task 2 - 3 Design Approach Workshop <br /> Consultant will conduct a Design Approach Workshop with the City. This workshop will be <br /> facilitated by the Consultant's Project Manager and will include key team members from the <br /> geotechnical and tunneling subconsultants. The workshop will rely on the information generated <br /> in Task 2 -2 to establish the agenda. Outcomes of the workshop will involve confirmation of the <br /> design criteria, and agreement on the approach for design. The workshop is assumed to require <br /> three (3) hours, including travel. <br /> Task 2 Prepare a Pre Design Report Supplement <br /> Consultant will prepare a Pre Design Report Supplement based on deliverables generated in <br /> Tasks 2 -2 and 2 -3. The Pre Design Report Supplement will include the following: <br /> • Draft schedule featuring coordination between Redwood City and. SBSA, <br /> • Opinion of soil conditions and their impact on tunneling method, <br /> • Measures required to protect the existing 48 -inch Walnut Street Gravity Interceptor <br /> crossing Highway 101 and the SBSA 48 -inch force main paralleling the east right -of -way <br /> line of Highway 101, <br /> • Results from discussions with Caltrans concerning existing pipeline records and <br /> allowance for advancement of a 60 -inch concrete product pipe without a casing, <br /> • Completed Risk Register, <br /> • Identification of mitigation for impact to the County Women's Correctional Center from <br /> construction, and <br /> • Preferred alignment, presented in a 30% design sketch format, <br /> • Preferred tunneling method, presented in a 30% sketch format with supporting text, <br /> • List of Specifications. <br /> REV: 12 -05 -13 VR <br /> Page 12 of 18 <br /> ATTY /AG8.2013,2401Ken nedyJenks_237900 <br />
The URL can be used to link to this page
Your browser does not support the video tag.