My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord 2403
RedwoodCity
>
City Clerk
>
Ordinances
>
2010-2019
>
2014
>
Ord 2403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 3:07:26 PM
Creation date
1/16/2014 3:07:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Meeting Type
Regular
Agency Type
City Council
Date
1/13/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
01/13/2014 <br /> Section 903.1.4. Metallic vent piping shall not be used underground in those <br /> areas underlain by Younger Bay Mud (see map published by Redwood City <br /> Building Division for approximate locations). <br /> Sec. 9.70. SECTION 1101.3.2 OF THE PLUMBING CODE ADDED: Section 1101.3.3 <br /> is hereby added to the Plumbing Code as follows: <br /> Section 1101.3.3. Metallic rainwater piping shall not be used underground in <br /> those areas underlain by Younger Bay Mud (see map published by Redwood <br /> City Building Division for approximate locations). <br /> Sec. 9.71. SECTION 1208.5.2.5 OF THE PLUMBING CODE ADDED: Section <br /> 1208.5.2.5 is hereby added to the Plumbing Code as follows: <br /> Section 1208.5.2.5. Metallic gas piping shall not be used underground in those <br /> areas underlain by Younger Bay Mud (see map published by Redwood City <br /> Building Division for approximate locations). <br /> ARTICLE VII RESERVED <br /> Secs. 9.72 — 9.80. RESERVED. <br /> SECTION 5. Article VIII of Chapter 9 of the Redwood City Code is hereby added <br /> to read as follows: <br /> Sec. 9.81. SECTION 300.6 (A) (4) OF THE ELECTRICAL CODE ADDED: Section <br /> 300.6 (A) (4) of the Electrical Code is hereby added to read as follows: <br /> Section 300.6(A) (4). Metallic conduit shall not be used underground in those <br /> areas underlain by Younger Bay Mud (see map published by Redwood City <br /> Building & Inspection for approximate locations). <br /> Secs. 9.82- 9.148. RESERVED. <br /> SECTION 6. Division 2 of Article IX of Chapter 9 of the Redwood City Code is <br /> hereby amended to read as follows: <br /> ARTICLE IX. SEISMIC REQUIREMENTS <br /> DIVISION 2 —AREAS OF REDWOOD CITY UNDERLAIN BY YOUNGER BAY MUD <br /> Sec. 9.150. PROVISIONS CUMULATIVE; ALTERNATE DESIGNS: The provisions <br /> of this Article shall be in addition to all other provisions of the Building Code insofar as <br /> the same relate to lot grading, soils design, foundation design, construction design, <br /> structural design, and other engineering design, with respect to the areas of the City <br /> referred to in Section 9.92 herein. Such provisions are not intended to prevent the use <br /> of any engineering design not referred to herein provided any such alternate has been <br /> approved by the Building Official. The Building Official may approve any such alternate <br /> provided the Building Official finds after review of comprehensive design data submitted <br /> ATTY/ORD.398/BUILDING CODE ADOPTION ORD.#2403 <br /> REV:11-22-13 JS FORMERLY MUFF#305 <br /> Page 8 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.