My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso13 PC13-29 2930 PC Reso Final EIR Cambridge Academy (2)
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2013
>
Reso13 PC13-29 2930 PC Reso Final EIR Cambridge Academy (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2014 10:07:20 AM
Creation date
2/6/2014 9:08:27 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
2/4/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Academy Project under CEQA, the CEQA Guidelines, and the Redwood City <br /> Municipal Code and Zoning Ordinance. <br /> Section 3. The Planning Commission certifies that the Final E1R for the <br /> Project was presented to the Planning Commission, that the Final EIR was <br /> prepared, published, circulated, reviewed and completed in full compliance with <br /> State law, including but not limited to CEQA and the CEQA Guidelines, that <br /> there was adequate public review of the Draft EIR, that it has considered all <br /> comments on the Draft EIR and responses to comments, that the Final EIR <br /> adequately discusses all significant environmental issues, and that the Final EIR <br /> reflects the independent judgment and analysis of the Planning Commission. <br /> Section 4. The Planning Commission has reviewed and considered the <br /> information contained in the Final EIR prior to acting on the proposed Cambridge <br /> Academy Project. <br /> Section 5. The information added to the Final EIR does not constitute <br /> significant new information requiring recirculation, but rather that additional <br /> information clarifies or amplifies an adequate EIR. <br /> Section 6. As described in the Final EIR (Section' 4.1 on p. 24-27, <br /> Sections 4.3 to 4.13 on p. 37-80, and Section 5.0 on p. 81-83, of the Draft EIR), <br /> the Project would result in no or less than significant effects to the environment <br /> relating to land use and planning, transportation, hazardous materials, air quality, <br /> greenhouse gas emissions, energy, utilities and service systems, visual <br /> character, geology and soils, hydrology and water quality, biological resources, <br /> cultural resources, and public facilities and services. With regard to hazards and <br /> hazardous materials impacts, as described in Section 4.4.3 on page 48-49 of the <br /> Draft FIR, the Project's conformance with the regulatory requirements outlined in <br /> Section 4.4.3.1 would reduce the potential for the Project to result in hazardous <br /> material impacts to less-than-significant levels. <br /> Section 7. The Final EIR identified significant and unavoidable noise <br /> impacts resulting from the Project's outdoor activities, both under Project-related <br /> outdoor activities (Section 4.2.3.2 on p. 32-35 of the Draft EIR) and under <br /> cumulative conditions (Section 6.1.4 on p. 86-88 of the Draft EIR), which <br /> considers the cumulative noise impact from project-related noise activities in <br /> combination with noise associated with the existing Montessori preschool onsite <br /> at full enrollment. Implementation of mitigation measures MM N01-1 (Section <br /> 4.2.4.1 on p. 35 of the Draft EIR) and MM CUM N01-1 (Section 6.1.5.1 on p. 88 <br /> of the Draft EIR), both of which require that a 7-foot tall noise barrier be <br /> constructed between the proposed play areas and the adjacent residences as <br /> shown in Figure 4.2-2 of the Draft EIR (p. 36), would reduce the Project's noise <br /> impacts but not to less than significant levels. To approve the project in <br /> accordance with CEQA Guidelines Section 15093, the Planning Commission <br /> ATTY/RESO,2930/PC RESO FINAL EIR CAMBRIDGE ACADEMY <br /> REV 01-10-14 JS <br /> Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.