Laserfiche WebLink
7.2.C. - Page 14 <br /> Compile Data <br /> Consultant shall structure and base the Master Plan database development on the above listed and <br /> completed projects,which are consistent with ArcHydro schemas. <br /> Deliverable:Database with Existing Data. <br /> Schedule: to be completed by April 18,2014 <br /> 2. Field Surveys Si Flow Monitoring <br /> Field.Visits <br /> Consultant shall conduct field visits of the five watersheds and take photographs and prepare a log of the <br /> flows? Consultant shall document the Field Visits in the database. <br /> Deliverable:Documented Field Visits. <br /> Schedule: to be completed by May 15,2014. <br /> Field Surveys <br /> Consultant shall conduct field surveys consisting of a measurement of the pipe depth from the manhole rim. <br /> If required by City, Consultant shall conduct a supplementary ground controlled survey (GPS), based on the <br /> certainty of the manhole rim elevations. Consultant shall survey approximately 82 manholes. Consultant shall <br /> enter all this data into the database. Consultant shall review any as-built records to verify the location and <br /> alignment,size, invert elevations,structures,etc.against available field and aerial surveys. <br /> Deliverable:Database with survey data for manholes/pipes. <br /> Schedule: to be completed by May 15,2014. <br /> Flow Monitoring <br /> Consultant shall install self-contained water-level recorders at two different locations within Redwood City to <br /> monitor flows over a single wet season. One station shall be located upstream of one of the pump station <br /> inflows (either the Maple or the Bradford Pump Station), and one station shall be located in a separate <br /> enclosed storm water culvert to monitor Redwood Creek. Consultant shall prepare a short memo to <br /> accompany the data submittal. <br /> Deliverable:Two Stream flow Gages with Tech Memo. <br /> Schedule: to be completed by May 15,2014. <br /> Task 3: Hydrologic and Hydraulic Model <br /> 1. Document Criteria <br /> Consultant shall review existing hydrologic and hydraulic criteria of past studies. Consultant shall work closely <br /> with the City to identify where additional or modified criteria may be necessary for use in planning and <br /> design. Consultant shall clearly document the additional criteria and include it in the final study report. <br /> Deliverable:Criteria. <br /> Schedule: to be completed by April 11,2014. <br /> REV:01-15-14 is <br /> Page 11 of 18 <br /> ATTY/AGR.2 014.007/Wood Rodgers Storm Plan <br />