My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-02-10 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-02-10 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 9:28:06 AM
Creation date
2/6/2014 4:03:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
2/10/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.A. - Page 11 <br /> methods in which the project is undertaken. Project pipe alignments will remain within the <br /> City right-of-way and construction methods are anticipated to remain the same. <br /> Due to the similarity of construction methods and pipe alignment within the City right-of- <br /> way that are anticipated within the expanded Recycled Water Service Area the City <br /> believes that there will not be any new significant effects of or increase in severity of any <br /> previously examined effects as required in 15162(a)(3)(A)&(B). Additionally it is <br /> anticipated that there will not be a change to the mitigation measures or the feasibility of <br /> the mitigation measures which could substantially reduce one or more significant effects <br /> on the environment as required in 15162(a)(3)(C)&(D). <br /> Expansion of the Recycled Water Service Area does not include approval or <br /> construction of any new recycled water facilities within the Service Area. When new <br /> recycled water facilities are proposed within the expanded Service Area, they will <br /> undergo their own CEQA evaluation at that time. <br /> Accordingly, the City has determined that none of the criteria set forth in the CEQA <br /> Guidelines cited above have been triggered by expansion of the Recycled Water Service <br /> Area. It is the City's determination that an Addendum to the 2003 MND for the recycled <br /> water project is the appropriate CEQA document for the purpose of this action. The <br /> updated Service Area Map does not result in the identification of new environmental <br /> impacts nor increase the severity of previously identified environmental impacts. The <br /> Addendum has identified that the proposed update to the Service Area does not result in <br /> any new conclusions about project impacts or mitigation measures that were not <br /> identified in the 2003 MND. <br /> Circulation and Consideration of Addendum <br /> Under Section 15164(c) of the CEQA Guidelines, an Addendum does not need to be <br /> circulated or noticed for public review. The decision making body (i.e., City Council) is <br /> required to consider the Addendum with the MND prior to making a decision on the <br /> project (CEQA Guidelines Section 15164[d]). The Addendum will be provided to the City <br /> Council for its consideration of a resolution to amend the Recycled Water Service Area. <br /> The Addendum will also be posted to the City's website (www.redwoodcity.orq) and is <br /> available at the Redwood City Community Services Department, 1017 Middlefield Road, <br /> Redwood City, CA 94064. <br /> ATTACHMENTS <br /> A. Environmental Documentation for Redwood City Recycled water Project <br /> B. Existing Recycled Water Service Area Map <br /> C. Proposed Recycled Water Service Area Map <br /> D. Appendix G — Environmental Checklist <br />
The URL can be used to link to this page
Your browser does not support the video tag.