My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-02-10 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-02-10 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 9:28:06 AM
Creation date
2/6/2014 4:03:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
2/10/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.2.D. - Page 15 <br /> TASK 3 — CONCEPTUAL DESIGN OF PRIORITY SITES <br /> Consultant shall prepare conceptual designs of the recommended LID control measures <br /> for up to ten priority projects. Consultant shall also compile planning level construction <br /> timelines, cost estimates for construction and operation and maintenance, and potential <br /> funding strategies. <br /> Task 3 Deliverable: Draft Technical Memorandum that will be reviewed by each <br /> municipality. Comments will be incorporated into the Watershed Improvement Plan <br /> developed in Task 4. <br /> TASK 4 — FINALIZED WATERSHED IMPROVEMENT PLAN AND PRESENTATION <br /> TO AGENCIES <br /> Consultant shall prepare a conceptual implementation plan that: <br /> • Summarizes the strategy used to select and prioritize locations for retrofit; <br /> • Recommends selected retrofit locations, specific treatment facilities for those <br /> locations, and planning level cost estimates for construction and operation and <br /> maintenance of the treatment facility; and <br /> • Formulates steps for implementation for each of the recommended Retrofit <br /> Projects. <br /> A draft WIP will be submitted to the City and other municipalities for review and <br /> comment. Comments will be incorporated into a final WIP for submittal to the Regional <br /> Water Board. <br /> Task 4 Deliverable: Draft Watershed Improvement Plan, Finalized WIP for submittal <br /> to the Water Board. <br /> TASK 5-- REGIONAL WATER QUALITY CONTROL BOARD REVIEW <br /> Consultant shall present the final WIP to the Regional Water Board as part of this task. <br /> Consultant shall revise the WIP, as appropriate, in response to Regional Water Board <br /> comments. <br /> Task 5 Deliverables: Presentation to Water Board, Revised Finalized Watershed <br /> Improvement Plan pi Aotivf*' <br /> Task 1: <br /> Project Kick-Off Meeting with the City of Redwood City. Week of January 27-31, <br /> 2014 <br /> Task 1 Deliverable: Project Administration Plan, Monthly Progress Reports Week of January 27-31 <br /> End of each Month <br /> Task 2: <br /> Meeting with each Agency(dates,times, and locations TBD), Outcome- <br /> Request additional information from Agencies. Set deadlines for receipt of February 2014 <br /> information. Develop a preliminary list of LID sites for field verification based <br /> REV:01-15-14 VR <br /> Page 13 of 16 <br /> ATTY/AGR.2014.008/Geosyntec Bayfront Watershed Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.