Laserfiche WebLink
7.2.D. - Page 14 <br /> to site conditions/constraints, installation of LID control measures would result in <br /> some hydrologic or water quality benefits. <br /> Consultant shall perform site visits at potential sites to determine site-specific <br /> feasibility. A Retrofit Inventory Form with specific information such as <br /> topography, property lines and ownership, storm drain outfall locations, drainage <br /> area, and other important site design features will be used to assess the sites in <br /> the field. The site visits will focus on practical considerations such as site <br /> accessibility, site area and configuration, existing drainage and availability of <br /> hydraulic head, adjacent land uses, and public acceptance. Photographs will be <br /> taken of the potential sites. With input from the City and other municipalities, <br /> Consultant shall then prioritize the locations most suitable for retrofitting. The <br /> output will be a prioritized list of the potentially feasible retrofit sites. <br /> Perform Site-Level BMP Screening <br /> Using a site-level constraints analysis, Consultant shall screen candidate LID <br /> control measures for each site, which could include site design measures such <br /> as downspout and impervious area disconnection, and LID treatment measures <br /> such as bioretention, other types of vegetated treatment measures, and <br /> permeable pavement. A full range of LID control measures will be examined to <br /> identify the best fit for each location. Consultant shall conduct the screening <br /> using criteria outlined in BASMAA's Feasibility/Infeasibility Criteria Report. <br /> Consultant shall choose candidate LID control measures that are appropriate for <br /> each location based on the following evaluation criteria: <br /> > Site constraints <br /> > Types of pollutants to be controlled <br /> > Performance/efficiency <br /> > Cost effectiveness <br /> > Ease and cost of installation <br /> • Ease and cost of operation and maintenance <br /> Y Permitting issues <br /> > Life expectancy <br /> The most suitable LID control measure for each location shall be identified. <br /> Opportunities and constraints shall be identified for the watershed as a whole <br /> and for each municipality uniquely. <br /> Task 2 Deliverables: Draft Technical Memorandum that summarizes the data <br /> gathered and reports the opportunities and constraints for the watershed and for each <br /> municipality, List of potentially feasible retrofit sites, of which ten retrofit sites shall <br /> be selected for use in Task 3. <br /> REV:01-15-14 VR <br /> Page 12 of 16 <br /> ATTY/AGR.2014.008/Geosyntec Bayfront Watershed Plan <br />