My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Geosyntec Consultants, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Geosyntec Consultants, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 12:16:56 PM
Creation date
2/24/2014 12:16:51 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Geosyntec Consultants, Inc
PROJECT NAME
Bayfront Canal watershed improvement plan
RMP File Number
304
Date
2/20/2014
MO Ref
14-027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
to site conditions/constraints, installation of LID control measures would result in <br /> some hydrologic or water quality benefits. <br /> Consultant shall perform site visits at potential sites to determine site-specific <br /> feasibility. A Retrofit Inventory Form with specific information such as <br /> topography, property lines and ownership, storm drain outFall locations, drainage <br /> area, and other important site design features will be used to assess the sites in <br /> the field. The site visits will focus on practical considerations such as site <br /> accessibility, site area and configuration, existing drainage and availability of <br /> hydraulic head, adjacent land uses, and public acceptance. Photographs will be <br /> taken of the potential sites. With input from the City and other municipalities, <br /> Consultant shall then prioritize the locations most suitable for retrofitting. The <br /> output will be a prioritized list of the potentially feasible retrofit sites. <br /> � Perform Site-Level BMP Screening <br /> Using a site-level constraints analysis, Consultant shall screen candidate LID <br /> control measures for each site, which could include site design measures such <br /> as downspout and imperviaus area disconnection, and LID treatment measures <br /> such as bioretention, other types of vegetated treatment measures, and <br /> permeable pavement. A full range of LID control measures will be examined to <br /> identify the best fit for each location. Consultant shafl conduct the screening <br /> using criteria outlined in BASMAA's Feasibilitv/Infeasibilitv Griteria Report. <br /> Consultant shall choose cand'idate LID control measures that are appropriate for <br /> each location based on the following evaluation criteria: <br /> ➢ Site constraints <br /> ➢ Types of pollutants to be controlled <br /> ➢ Performance/efficiency <br /> ➢ Cost effectiveness <br /> ➢ Ease and cost of installation <br /> ➢ Ease and cost of operation and maintenance <br /> ➢ Permitting issues <br /> ➢ Life expectancy <br /> The most suitable LID control measure far each location shall be identified. <br /> Opportunities and constraints shall be identified for the watershed as a whole <br /> and for each municipality uniquely. <br /> Task 2 Deliverables: Draft Technical Memorandum that summarizes the data <br /> gathered and reports the opportunities and constraints for the watershed and for each <br /> municipality, List of potentially feasible retrofit sites, of which ten retrofit sites shall <br /> be selected for use in Task 3. <br /> REV:01-15-14 VR <br /> Page 12 of 16 <br /> ATTY/AGR.2014.008/Geosyntec Bayfront Watershed Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.