My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
CC Min 1998-05-04 Stdy
RedwoodCity
>
City Clerk
>
Minutes
>
1990-1999
>
1998
>
CC Min 1998-05-04 Stdy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:43:57 PM
Creation date
4/5/2004 12:47:57 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Minutes
Meeting Type
Study
Agency Type
City Council
Date
5/4/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> "The critical mix in terms of what you are looking at tonight is different from what you <br /> looked at in the past. Some of you were on the Council several years ago when the notion <br /> of storm water fees was looked at. That was a fee specifically to support the operations of <br /> maintaining your storm drain system, to get that out of the general fund, because it is now <br /> a regulated activity. What is different about the current suggestion is that you would <br /> make no change in your operation budgets, and the funding of those budgets for storm <br /> water or sewer maintenance; but you would fold the two activities together so you could <br /> leverage the value of your sewer system to borrow money to fix your storm drain system. <br /> So you would have a capital component folded in, but your operations would essentially <br /> stay funded about the same as they are now. That is an essential difference from the last <br /> discussion that occurred at the Council level about two years ago. It doesn't mean the <br /> same issues won't come up, about equity, about what is fair, who should pay what, about <br /> how much of the leadership should Redwood City provide versus how much other <br /> agencies should bring to the table. If you provide coordination, if you provide leadership, <br /> and if you provide a funding mechanism that you could then make choices about later <br /> down the road, you would probably have a much stronger place at the table when it is <br /> time to get other cities or the County or the State or even the Federal Government to <br /> entertain seriously bringing dollars to the table. Part of what you should think about <br /> tonight is leverage, both political leverage and financial leverage that you could apply." <br /> Director Ingram provided a handout and explained each item on the Potential Time <br /> Line: 1) Combine sewer/storm water ordinance, 3 months; 2) hire program coordinator, 3 <br /> months; 3) program coordination services, on-going; 4) reach consensus on projects and <br /> priorities, 6 months; 5) design bid documents, 12 months; 6) permits and possible EIR; 7) <br /> complete sewer rates, 5 months; 8) variable sewer rates take effect, 3 months; 9) issue <br /> Revenue Bonds, 3 months; and 10) beginning construction of improvements. <br /> Director Ingram said this program assumes that there will never be enough money to <br /> take care of every single flooding problem, and there was a real need to develop a <br /> consensus, so that everyone "understands the priorities... and support the decisions made <br /> around them." He said there were some existing documents that could be used as a base <br /> to build new studies, but nothing like that exists for Cordilleras Creek, which will need <br /> engineering and options developed. Director Ingram described all the agencies that will <br /> have jurisdictions as soon as the City moves on the Bayfront Canal, and explained why it <br /> might take a long time to get the permits, and possibly an EIR. He said at that point the <br /> City would have to have a professional rate study done for the Sewer Enterprise Fund <br /> "that will give the financial credibility to lending institutions just to position you to be in <br /> that market." He said the Utilities Committee had discussed for years, the possibility of <br /> moving to a variable rate rather than a fixed monthly rate. Director Ingram said senior <br /> citizens have been asking for that for years, as it will give them more control over their <br /> utility bills. He said bond counsel would be helpful throughout the process. <br /> Director Ingram said the beginning of the fiscal year is the best time to enact a change. <br /> He said if the Council wished to make changes in both rate structure and rate according to <br /> the Utilities Committee's recommendation, then July I, 1999 would be the target date. <br />Study Session MINUTE BOOK NO. 56 May 4,1998 <br />Minutes Page No. 442 Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.