Laserfiche WebLink
7.1. B. - Page 17 <br /> Hours for bid support and construction support are budget hours. Hours for Task 5 <br /> will be billed on a time and material basis. <br /> TASK 6 — SLOPE STABILITY ANALYSIS (OPTIONAL) <br /> Consultant will provide supplemental investigation to characterize landslide and perform <br /> slope stability analysis, if required, through the result of the initial geotechnical <br /> investigation in Task 3 upon approval by the City. <br /> 6.1 Hand dig 2 shaft excavation holes to 30 feet below grade. <br /> 6.2 CSA log holes, grab slide plane samples and prepare cross section. <br /> 6.3 Provide laboratory testing for slope stability. <br /> 6.4 Provide slope stability analysis calculations. <br /> 6.5 Prepare a report on slope stability analysis and required design <br /> parameters. <br /> * *See attached documents for Project Schedule, Fees and Labor Rates. <br /> REV: 02 -21 -14 VR <br /> Page 14 of 17 <br /> ATTY/AGR.2014.01 9/Mark Thomas & Company, Inc. <br />