My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-03-10 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-03-10 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2014 8:52:01 AM
Creation date
3/6/2014 4:59:42 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/10/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.B. - Page 16 <br /> 4.4 Prepare Final Construction Cost Estimate <br /> Consultant will prepare a final construction cost estimate based on the 100% <br /> complete plans. <br /> 4.5 Prepare Construction Bid Package <br /> After City review and comment on the 100% submittal, Consultant will incorporate <br /> all comments and produce a final set of construction contract documents ready for <br /> the City to put out to bid. <br /> Deliverables: <br /> • One full -size set of 100% plans, specifications and estimate (PS &E) <br /> • One set of final contract documents, including stamped and signed plans <br /> (full size) <br /> • Final drawings in AutoCAD and PDF format, specifications in Word and <br /> cost estimate and probable construction schedule in Excel <br /> TASK 5 — BID SUPPORT AND CONSTRUCTION SUPPORT <br /> 5.1 Consultant will provide bid period support by attending the pre -bid conference and <br /> responding to questions during the bid period. It is assumed the City will administer <br /> the bid process and be the central point of contact for contractors with bid <br /> questions. Consultant will assist in issuing a minor addenda if required. <br /> 5.2 Attend and conduct pre -bid meeting, respond to questions from prospective <br /> bidders, assist in issuing addenda (as directed by the City), and provide written <br /> recommendations to the City and provide the following hours for construction <br /> support: <br /> a. Review shop drawings submittals: (12 hours) <br /> b. Change order requests: (3 hours) <br /> c. Requests for information: (5 hours) <br /> 5.3 Participate in the final inspection and assist with punch list of deficiencies <br /> 5.4 Prepare "As- Built" drawings based on construction field notes and limited field <br /> review by the Consultant <br /> Deliverables: <br /> • Responses to bid period questions <br /> • Comments on contractor submittals <br /> • Responses to contractor RFIs <br /> • Attend one pre -bid meeting and up to three site visits during construction <br /> • One full -size set of as -built plans on 4 -mil polyester media <br /> • All final documents in AutoCAD, Word and Excel <br /> REV: 02 -2144 VR <br /> Page 13 of 17 <br /> ATTY /AGR.2014.019 /Mark Thomas & Company, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.