My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-03-10 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-03-10 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2014 8:52:01 AM
Creation date
3/6/2014 4:59:42 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/10/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1. B. - Page 15 <br /> 3.3.3 Temporary grading, stage construction and equipment staging area plans will <br /> be prepared as necessary after further coordination with the City to <br /> determine requirements for keeping the access road open during <br /> construction. <br /> 3.4 75% Structure Design <br /> 3.4.1 Provide wall layout, wall structural design, select wall type, and provide <br /> recommendation for suitable materials and graffiti prevention, and coordinate <br /> design with various City Departments. Wall plans shall include general and <br /> construction notes, plan and profile drawings, structural details, material <br /> requirements, finishes. The design calculations and analysis will include all <br /> final engineering, technical data, catalogue cut sheets, and maintenance <br /> considerations. The design drawings will include: <br /> a. Beginning and end of wall stations <br /> b. Elevation on top of wall at beginning and end of wall station, as well as all <br /> break points <br /> c. Ground line profile in front and behind the retaining wall <br /> d. Cross sections of the retaining wall <br /> e. Recommendations for three suitable wall materials <br /> 3.5 Draft Specifications <br /> 3.6 75% Cost Estimate <br /> Deliverables: <br /> • Six sets of the 75% design submittal shall be presented to the City for <br /> review <br /> • 75% level project plans <br /> • Draft contract specifications <br /> • 75% level construction cost estimate <br /> • Four (4) copies of the geotechnical report. <br /> TASK 4 — FINAL DESIGN (100% DESIGN & BID PACKAGE SUBMITTAL) <br /> 4.1 Review and respond to 75% Design Submittal review comments. <br /> 4.2 Prepare 100% Design Submittal based on the 75% design submittal review. <br /> The 100% Design Submittal shall be ready for signature and submitted to the City <br /> for review and comments. A signed 100% submittal set shall be submitted once all <br /> final comments are completed. <br /> 4.3 Prepare Final Specifications <br /> Consultant will prepare the final construction specifications based on the City <br /> comments on the draft specifications review. The final specifications will include all <br /> construction contract requirements. <br /> REV: 02 -21 -14 VR <br /> Page 12 of 17 <br /> ATTY /AGR.2014.019 /Mark Thomas & Company, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.