My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-03-24 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-03-24 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 4:19:04 PM
Creation date
3/20/2014 6:17:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/24/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 32 ATTACHMENT 1 <br /> 42. The applicant shall provide all field survey data related to the project. The <br /> data shall be provided in AutoCad drawing files. <br /> 43. The applicant shall retain a Civil Engineer to prepare "as-built" or "record" <br /> drawings, and the drawings shall be submitted in AutoCad format. <br /> 44. Continuous site inspection shall be provided by a Soils Engineer at the <br /> Developer's expense during trenching and backfill operations. The Soils <br /> Engineer shall take compaction tests, and shall submit test results to the <br /> City Engineer for approval. <br /> 45. The radii at the curb returns at the street entrances and at all turns shall <br /> accommodate the WB-50 truck turning template. <br /> 46. The Applicant shall prepare a Notice of Intent (and submit a copy to the <br /> City) for the proposed grading operation. <br /> 47. Prior to Final Map approval, Applicant shall secure all rights to off-site <br /> improvements necessary to serve the Project, to the City Engineer's <br /> satisfaction. <br /> 48. Minor corrections have been redlined on the submitted check prints and <br /> should be corrected and resubmitted by the Applicant prior to the Final Map. <br /> 49. Any further modifications and/or corrections to the Vesting Tentative Maps <br /> are subject to the review and approval of the City Engineer. <br /> Fire Department <br /> 50. Fire Department access roads shall be required when any portion of the <br /> facility or any portion of an exterior wall of the first story of the building is <br /> located more than 150 feet from fire apparatus access, unless an alternative <br /> method or means of protection has been approved by the Fire Marshal. <br /> 51. Emergency Vehicle access shall comply with CFC and the Redwood City <br /> Fire Department Standards. Design shall meet city standards for weight <br /> loading with a clear width of 26' as per the CFC. Reduction in width may be <br /> granted upon final site plan development as reviewed and approved by the <br /> Fire Marshal. <br /> 52. Underground fire service mains shall be a minimum size of 8" as per <br /> Redwood City Standards. Minimum fire-flow shall be 4000 GPM with a four- <br /> hour duration in flow. Fire hydrant spacing shall not exceed 350' apart. <br /> Cathodic protection is required. <br /> ATTY/RESO.2967/CC PETE'S HARBOR—DENYING APPEAL AND APPROVING PROJECT <br /> REV:03-18-14 VR <br /> Page 12 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.