My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-03-24 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-03-24 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 4:19:04 PM
Creation date
3/20/2014 6:17:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/24/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
v c_) <br /> Potential Potential <br /> • o <br /> Significance Significance <br /> Without Mitigation With N a <br /> Impacts Mitigation Mitigation Measures Responsibility Mitigation N, o <br /> 0 0 <br /> the AM and PM Peak Hours. For the intersection to ▪ n <br /> operate at an"acceptable" LOS(D or better)under <br /> Cumulative (2020)With Project conditions without a <br /> railroad grade separation at Whipple Avenue, <br /> provide a dedicated right turn lane, two through <br /> lanes, and a dedicated left turn lane on the <br /> eastbound approach to the intersection (currently, <br /> the eastbound approach is configured with one <br /> shared through/left-turn lane and one shared <br /> through/right-turn lane). In addition, change the <br /> east-west left turn signal phasing from split(i.e., <br /> shared with opposing through traffic)to protected <br /> (i.e., exclusive). With these lane additions and <br /> signal phasing modifications, the intersection would <br /> be expected to operate acceptably(LOS D)during <br /> the AM and PM peak hours under Cumulative(2020) <br /> With Project conditions. <br /> Widening the eastbound approach would tend to <br /> increase peak eastbound traffic volumes on a <br /> residential street and would require careful design to <br /> provide enough physical clearance to allow opposing <br /> eastbound and westbound left turns to proceed <br /> simultaneously. Additionally, both of the mitigation <br /> alternatives discussed above are considered to be <br /> infeasible due to right-of-way and physical <br /> constraints. Therefore,the addition of project traffic <br /> to the El Camino Real/Whipple Avenue intersection <br /> is expected to result in a significant unavoidable <br /> cumulative impact. <br /> Impact 7-16: Cumulative(2020)With Project S Mitigation 7-16. Add an eastbound right turn lane City,Applicant LS <br /> Impact on the Veterans Boulevard/Whipple at the intersection of Veterans Boulevard and <br /> Avenue Intersection. Under Cumulative(2020) Whipple Avenue. The City currently has an m <br /> Without Project conditions, the Veterans improvement planned for the intersection of <br /> Boulevard/Whipple Avenue intersection is expected Veterans Boulevard and Whipple Avenue as part of OD. <br /> • <br /> S = Significant • _ <br /> LS = Less than significant s -01) <br /> SU = Significant unavoidable impact o � <br /> NA = Not applicable <br /> T:I10695 Pete's Harbor EIR Addendumlrevised addendum no 21Table 1-1(10695-01).doc CO <br />
The URL can be used to link to this page
Your browser does not support the video tag.