Laserfiche WebLink
v c_) <br /> Potential Potential <br /> o <br /> Significance Significance <br /> Without Mitigation With N a <br /> Impacts Mitigation Mitigation Measures Responsibility Mitigation N, o <br /> O o <br /> proposed reconfiguration of the inner marina, .A n <br /> including installation of the hand boat launch. <br /> • Contract with a water quality and sediment <br /> testing laboratory certified by the State of <br /> California to conduct updated testing of <br /> sediments in the inner marina of Pete's Harbor. <br /> Results from the updated testing shall be <br /> submitted along with the JARPA. <br /> Implementation of these measures would reduce the <br /> impacts of the inner marina reconfiguration to a <br /> less-than-significant level. <br /> This mitigation may be integrated with Mitigations 8- <br /> 1 (Impacts on Steelhead and Chinook Salmon), 8-2 <br /> (Impacts on Essential Fish Habitat), 8-3(Impacts on <br /> the California Clapper Rail), and 8-6(Project Loss of <br /> Saline Emergent Wetlands). <br /> Impact 9-4: Project Impacts on Marina and NA Mitigation 9-4. The mitigation is not required. NA NA <br /> Creek Sedimentation and Associated Creek/Bay <br /> Water Quality Impacts. The impact would not <br /> occur. <br /> INFRASTRUCTURE AND PUBLIC SERVICES <br /> Impact 10-1: Project-Related and Cumulative LS Mitigation 10-1. The mitigation is not required. NA NA <br /> Municipal Water Service Demand. The impact <br /> would be less-than-significant. <br /> Impact 10-2: Project-Related and Cumulative LS Mitigation 10-2. The mitigation is not required. NA NA <br /> Impacts on Sewage Treatment and Transmission <br /> co <br /> Capacity. The impact would be less-than- <—. <br /> significant. a <br /> cDD <br /> D <br /> S = Significant _ <br /> LS = Less than significant j <br /> SU = Significant unavoidable impact o <br /> NA = Not applicable <br /> T:I10695 Pete's Harbor EIR Addendumlrevised addendum no 2ITable 1-1(10695-01).doc W <br />