Laserfiche WebLink
(-_) �_ <br /> Potential Potential <br /> o <br /> Significance Significance <br /> Without Mitigation With N a <br /> Impacts Mitigation Mitigation Measures Responsibility Mitigation N, o <br /> 0 0 <br /> (1) Demolition Period. Require implementation of .A n <br /> the following dust control measures by contractors <br /> during demolition of existing structures: <br /> (a) Watering shall be used to control dust <br /> generation during demolition of structures <br /> and break-up of pavement; <br /> (b) All trucks hauling demolition debris from <br /> the site shall be covered; and <br /> (c) Whenever possible, dust-proof chutes <br /> shall be used for loading debris onto <br /> trucks. <br /> _(2) All Construction Phases. Require <br /> implementation of the following dust control <br /> measures by construction contractors during all <br /> construction phases: <br /> (a) Water all active construction areas at <br /> least twice daily and more often during <br /> windy periods. Active construction areas <br /> adjacent to existing land uses must be <br /> kept damp at all times, or must be treated <br /> with non-toxic stabilizers or dust <br /> palliatives; <br /> (b) Water or cover all stockpiles of debris, <br /> soil, sand, or other materials that can be <br /> blown by the wind; <br /> m <br /> (c) Cover all trucks hauling soil, sand, and <. <br /> other loose materials, or require all trucks a <br /> to maintain at least two feet of freeboard; m <br /> cDD <br /> •S = Significant _ <br /> LS = Less than significant s 171 <br /> SU = Significant unavoidable impact Nc� <br /> NA = Not applicable <br /> N <br /> T:I10695 Pete's Harbor EIR Addendumlrevised addendum no 2ITable 1-1(10695-01).doc <br />