My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-03-24 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-03-24 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 4:19:04 PM
Creation date
3/20/2014 6:17:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/24/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L <br /> Potential Potential > <br /> co co <br /> vD <br /> Significance Significance <br /> Without Mitigation With N -o <br /> Impacts Mitigation Mitigation Measures Responsibility Mitigation � <br /> 0 <br /> cp <br /> (d) Pave, apply water three times daily, or <br /> apply(non-toxic)soil stabilizers on all N <br /> unpaved access roads, parking areas, <br /> and staging areas at construction sites; <br /> (e) Sweep daily(preferably with water <br /> sweepers)all paved access road, parking <br /> areas, and staging areas at construction <br /> sites; <br /> (f) Sweep streets daily(preferably with water <br /> sweepers)if visible soil material is carried <br /> onto adjacent public streets; <br /> (g) Hydroseed or apply non-toxic soil <br /> stabilizers to inactive construction areas; <br /> (h) Enclose, cover, water twice daily, or apply <br /> non-toxic soil binders to exposed <br /> stockpiles(dirt, sand, etc.); <br /> (i) Limit traffic speeds on unpaved roads to <br /> 15 miles per hour; <br /> (j) Install sandbags or other erosion control <br /> measures to prevent silt runoff to public <br /> roadways; and <br /> (I) Replant vegetation in disturbed areas as <br /> quickly as possible. <br /> < <br /> Impact 15-2: Project and Cumulative Impacts on LS Mitigation 15-2. The mitigation is not required. NA NA m <br /> Regional Emissions. The impact would be less- <br /> than-significant. <br /> m <br /> -0 > <br /> S = Significant co m _ <br /> LS = Less than significant a <br /> SU = Significant unavoidable impact w c o <br /> NA = Not applicable <br /> T:110695 Pete's Harbor EIR Addendumlrevised addendum no 21Table 1-1(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.