Laserfiche WebLink
MIG F 8.A. - Page 277 <br /> City of Redwood City Revised Elm Huaenaurn <br /> January 22, 2014 Page 3-36 <br /> Conclusion. Mitigations 7-18 through 7-27 are no longer required. The impacts would be less- <br /> than-significant. <br /> It should also be noted here that the East Bayshore Road/Bair Island Road intersection, which <br /> has been constructed as a roundabout at the One Marina development, would provide access <br /> to Pete's Harbor and is expected to operate at acceptable LOS under both Cumulative Without <br /> Project and Cumulative With Project conditions. <br /> Other Impacts. The 2003 EIR determined that the previous Marina Shores Village project <br /> would have a less-than-significant impact on project driveway operations. The current Pete's <br /> Harbor project includes no changes or new conditions that would alter this conclusion. <br /> T:I10695 Pete's Harbor EIR Addendumlrevised addendum no 213(10695-01).doc <br />