My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-03-24 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-03-24 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 4:19:04 PM
Creation date
3/20/2014 6:17:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/24/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B.A. - Page 290 Pete's Harbor <br /> uiry or rceawooa illy Revised EIR Addendum <br /> January 22, 2014 Page 3-49 <br /> City-adopted Parks Impact Fee per City Ordinance 2318. With these refinements, the mitigation <br /> remains sufficient to reduce this impact to a less-than-significant level. <br /> Impact 10-9 Analysis: Solid Waste Diversion Impacts. Due to the high-rise tower aspect of <br /> a large portion of the 2003 EIR project, the 2003 EIR concluded that project residents may have <br /> found the locations of recycling bins to be too distant or inconvenient, resulting in a potential <br /> conflict with state-mandated requirements for 50 percent solid waste stream diversion. The <br /> 2003 EIR mitigation for this impact required project provision of chutes for recyclable materials <br /> immediately adjacent to garbage chutes, or at another suitable location approved by the City, in <br /> the residential towers, as well as provision of bins for recyclables storage in each tower <br /> residential unit. <br /> Although the multi-story residential buildings in the current Pete's Harbor project would have a <br /> reduced maximum height of 70 feet compared to the previous project's 240 feet, this impact <br /> would remain potentially significant. <br /> Conclusion. Modified impact and mitigation. Impact and Mitigation 10-9 have been modified to <br /> reflect the reduced project. The mitigation identified in the 2003 EIR for Impact 10-9 remains <br /> applicable to the wraparound building, whose maximum height would be 70 feet, and remains <br /> sufficient to reduce this impact to a less-than-significant level. <br /> Other Impacts. The certified 2003 EIR determined that the following additional infrastructure <br /> and public services impacts would be less-than-significant: water delivery system and storage <br /> impacts, construction impacts of project-related sewer system modifications, project and <br /> cumulative impacts on public school services, cumulative impacts on parks and recreation <br /> services, project impacts on solid waste service, and child care impacts. The current Pete's <br /> Harbor project includes no changes or new conditions that would adversely affect these EIR <br /> conclusions. <br /> T.110695 Pete's Harbor EIR Addendumlrevised addendum no 213(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.