Laserfiche WebLink
B.A. - Page 290 Pete's Harbor <br /> uiry or rceawooa illy Revised EIR Addendum <br /> January 22, 2014 Page 3-49 <br /> City-adopted Parks Impact Fee per City Ordinance 2318. With these refinements, the mitigation <br /> remains sufficient to reduce this impact to a less-than-significant level. <br /> Impact 10-9 Analysis: Solid Waste Diversion Impacts. Due to the high-rise tower aspect of <br /> a large portion of the 2003 EIR project, the 2003 EIR concluded that project residents may have <br /> found the locations of recycling bins to be too distant or inconvenient, resulting in a potential <br /> conflict with state-mandated requirements for 50 percent solid waste stream diversion. The <br /> 2003 EIR mitigation for this impact required project provision of chutes for recyclable materials <br /> immediately adjacent to garbage chutes, or at another suitable location approved by the City, in <br /> the residential towers, as well as provision of bins for recyclables storage in each tower <br /> residential unit. <br /> Although the multi-story residential buildings in the current Pete's Harbor project would have a <br /> reduced maximum height of 70 feet compared to the previous project's 240 feet, this impact <br /> would remain potentially significant. <br /> Conclusion. Modified impact and mitigation. Impact and Mitigation 10-9 have been modified to <br /> reflect the reduced project. The mitigation identified in the 2003 EIR for Impact 10-9 remains <br /> applicable to the wraparound building, whose maximum height would be 70 feet, and remains <br /> sufficient to reduce this impact to a less-than-significant level. <br /> Other Impacts. The certified 2003 EIR determined that the following additional infrastructure <br /> and public services impacts would be less-than-significant: water delivery system and storage <br /> impacts, construction impacts of project-related sewer system modifications, project and <br /> cumulative impacts on public school services, cumulative impacts on parks and recreation <br /> services, project impacts on solid waste service, and child care impacts. The current Pete's <br /> Harbor project includes no changes or new conditions that would adversely affect these EIR <br /> conclusions. <br /> T.110695 Pete's Harbor EIR Addendumlrevised addendum no 213(10695-01).doc <br />