My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-03-24 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-03-24 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 4:19:04 PM
Creation date
3/20/2014 6:17:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/24/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MIG F 8.A. - Page 289 <br /> City of Redwood City Revised Elm Huaenaurn <br /> January 22, 2014 Page 3-48 <br /> turning radii requirements. The 2003 EIR mitigation required City discretionary approval of the <br /> tentative subdivision map, including the project's road design and emergency access provisions. <br /> The current Pete's Harbor project site plan (see Figure 2.5 in this Addendum), although reduced <br /> in density, incorporates a similar high-density, compact development pattern, and the <br /> associated potential for similar emergency access impacts remain. <br /> Conclusion. No change. The mitigation identified in the 2003 EIR for Impact 10-7 remains <br /> applicable to the current Pete's Harbor project and remains sufficient to reduce this impact to a <br /> less-than-significant level. <br /> Impact 10-8 Analysis: Project Impacts on Parks and Recreation Services. The certified <br /> 2003 EIR concluded that the previous Marina Shores Village project would generate the need <br /> for approximately 6.8 acres of new parkland (based on the site's projected net increase of 3,910 <br /> residents and an existing City ratio of approximately 1.7 acres of parkland per 1,000 residents). <br /> The previous project's conceptual landscape plans included an approximately two-acre <br /> community park on off-site land adjacent to the Peninsula Marina (now One Marina) property. <br /> The associated 2003 EIR mitigation required project compliance with the City's Parks, <br /> Recreation and Community Services Department Strategic Plan, should that plan be adopted <br /> prior to project approval; or incorporation of parkland amenities into the project sufficient to <br /> serve the project residents, subject to approval by the City Community Development Services <br /> Department and Parks, Recreation and Community Services Department. (The Strategic Plan <br /> has since been adopted [2004]). The City had not yet adopted a Parks Impact Fee (see below). <br /> Based on the same parkland demand per 1,000 residents ratio used for the previous project and <br /> a projected on-site population of 855 residents under the current Pete's Harbor project, the <br /> current project would generate the need for approximately 1.45 acres of new parkland. The <br /> current site plan identifies a total of approximately 1,258 linear feet of public acreage adjacent to <br /> Smith Slough and Redwood Creek, including a playground, an esplanade, and viewing areas <br /> (see Figures 2.5 through 2.13). The project site also would include a public hand boat launch <br /> (see Figure 2.14). The current Pete's Harbor project on-site public open space and landscape <br /> areas would be accessible via an on-site pedestrian and bicycle path network. All public areas <br /> would be ADA-accessible. <br /> The public open space and recreation facilities incorporated into the current Pete's Harbor <br /> project would reduce the previously identified impact on parks and recreation services, perhaps <br /> to less-than-significant levels; however, until detailed park and recreation provisions for the <br /> proposed project are approved by the City Community Development Department and Parks, <br /> Recreation and Community Services Department, it is still assumed that this impact may <br /> potentially be significant. <br /> To help provide parks and recreation services to future development in Redwood City, the City <br /> has adopted a Parks Impact Fee (Ordinance No. 2318; October 23, 2007; Article XVI of the City <br /> Code of Ordinances), which would be applied to the proposed project. <br /> Conclusion. Modified impact and mitigation. Impact and Mitigation 10-8 have been modified to <br /> reflect the reduced project and the currently proposed public amenities. The mitigation for <br /> Impact 10-8 is hereby updated with the following information: final open space and parkland <br /> area totals and design specifics shall be subject to City approval. Any additional parkland <br /> impact could be mitigated through either additional on-site parkland/facilities or payment of the <br /> T.110695 Pete's Harbor EIR Addendumlrevised addendum no 213(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.