My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-04-07 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-04-07 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2014 8:30:06 AM
Creation date
4/3/2014 4:51:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
4/7/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.2.A. - Page 26 <br /> • Thorough inspection and maintenance visits in late summer or early fall prior to the rainy <br /> season. <br /> • Monitoring at least twice during the wet season (typically December and March). <br /> • Monitoring BMP's following flood events. <br /> Observations and recommendations for corrective measure (if necessary)will be recorded and <br /> kept by the property owner, their Facilities Department, or property manager. They will also be <br /> responsible for the monitoring and maintenance of data collected, which will need to be kept on- <br /> site and made available to the City of Redwood City staff for inspection. Remedial maintenance <br /> will be performed immediately or scheduled to take place within a reasonable time frame. <br /> Name of Responsible Party for self-inspections: <br /> Address: <br /> Phone: I Fax: E-mail: <br /> Description of Items for Self-Inspection <br /> Self-Inspection Schedule <br /> (e.g. BMP, non storm discharges,soil erosion,and others applicable to site) <br /> Inlets, Catch Basins, Drains, Planters Following Storm Events <br /> Media Filter Following Storm Events <br /> Flow Monitoring March& December <br /> 6.4 Employee Training Program <br /> Employees shall be trained to implement post-construction operations and maintenance of all <br /> storm water BMP's at the project site. <br /> • A copy of the SWMP will be made available to personnel in charge of facility <br /> maintenance and will be distributed to the subcontractor representative engaged in the <br /> maintenance or installation of the BMP's. <br /> • Training sessions will be included as a part of Facilities Department meetings to <br /> familiarize members with the SWMP. <br /> • A copy of the yearly inspection reports shall be managed by the Facilities Department. <br /> Name of Responsible Party for training: <br /> Address: <br /> Phone: I Fax: E-mail: <br /> Description of Items for Training Employees To Be Trained <br /> Training Schedule <br /> (e.g.maintenance, inspection, pesticide use) (Job Category or Title) <br /> Maintenance Inspection Yearly Facilities Department Members <br /> Pesticide Use Yearly Facilities Department Members <br /> 15 <br /> BKF Job No. 20070073 <br /> K:\MAIN\2007\070073\06 Design\C Storm Drain System\SWMP\2011-11-04\333_MAIN_SWMP.doc <br /> ATTY/AGR.2014.0281333 Main Street Stormwater Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.