Laserfiche WebLink
Annual General Plan Progress Report for Calendar Year 2013 <br /> 2013 <br /> Program Number Program Description Status Date Completed 2013 Update co <br /> Program PS-44 Local Hazard Mitigation Plan I/O The Fire Department continues to evaluate the existing Disaster Mitigation Act requirements <br /> (DMA 2000)for natural and man made disasters,as to protect life and property for the City.This <br /> includes the Port of Redwood City, Redwood Shores, Downtown,and the Hillside sections of the cQ <br /> City. The plan was completed and adopted in November 2010. CD <br /> 01 <br /> W <br /> Program PS-45 Geologic Hazard Abatement TBI <br /> Districts <br /> Program PS-46 Protect Essential Public I/A Public Works replaced a total of five storm water management pumps,and is in progress for <br /> Facilities From Flooding replacing flap gates at the Belmont Slough de-watering structure and Oddstad pump station. <br /> Program PS-47 Community Facility I/O Redwood City has an ongoing commitment to ensure the facilities and parks are maintained to the <br /> Improvement Maintenance highest possible standard with the available resources. All known safety and/or hazardous <br /> conditions are immediately mitigated and staff continues to seek new ways to reduce liability and <br /> prevent injuries at every opportunity. <br /> Program PS-48 Hazardous Material Releases TBI <br /> from Prior Land Uses <br /> Program PS-49 Levees Upgraded to FEMA I/O Levees protecting Redwood Shores have been certified and accredited by FEMA. <br /> Standards <br /> Program PS-50 Implement Strategy to TBI <br /> Address Flooding(2000) <br /> Program PS-51 Seismic Events and I/O Public Works continues to work with the CEH department for collecting household hazard <br /> Hazardous Materials materials from Redwood City residents.The program collects household hazard materials twice a <br /> Outreach year. <br /> Program PS-52 Creekside Property Owner TBI <br /> Education <br /> Program PS-53 Interagency Stormwater I/O Discussion continues with Menlo Park,San Mateo County,Atherton,and Woodside regarding the <br /> Drainage Consultation Bayfront/Atherton Channel drainage. <br /> Legend Status Instructions <br /> C Completed 1.For programs completed before the Annual Report's time period,indicate a C for the"Status"column and note the date it was completed in the"Date Completed"column. <br /> C/A Completed/Key Accomplishment 2.For programs completed during the Annual Report's time period,indicate C/A for the"Status"column,not the date it was completed in the"Date Completed"column,and add t <br /> I/A In Progress/Key Accomplishments "Notes"column. <br /> I/O In Progress/Ongoing 3.For programs initiated before or during the Annual Report's time period and for those that have attained some key accomplishments,indicate I/A for the"Status"column and nc <br /> TBI To Be Implemented accomplushments in the"Notes"column. <br /> 4.For programs initiated before or during the Annual Report's time period but do not have3 key accomplishments yet,indicate I/O in the"Status"column. for those prgrams that I <br /> processes that city staff do regularly and will not produce any significant accomplushments,use this status. <br /> 5.For prgrams that will be initiated sometime in the future,indicate TBI in the"Status"column. Page 37 of 45 <br />