My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-04-07 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-04-07 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2014 8:30:06 AM
Creation date
4/3/2014 4:51:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
4/7/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.E. - Page 7 <br /> EXHIBIT "A" <br /> SCOPE OF SERVICES and FEE <br /> 1.0 Introduction <br /> The original agreement's scope of services have 6 original tasks; and 1 later added task <br /> to assist the City with the FEMA Grant application submittal. <br /> This agreement amendment expands the original scope of services to require <br /> Consultant to design and provide engineering construction support for an additional <br /> project eligible for grant funding -- the Redwood Shores Pipeline Seismic Improvements <br /> (Expanded Original Task 1), and the Peninsula 2 Tank Modification (Expanded Original <br /> Task 4). Consultant is also tasked with additional as-needed technical assistance for <br /> grant management, and design and construction support services to refine the existing <br /> design packages (Expanded Original Tasks 1,2,3,6 and 7). <br /> Consultant shall perform the work necessary to produce contract documents for seismic <br /> upgrades of specific items listed below. All described in more detail below. <br /> 2.0 Scope of Work <br /> • Expanded Original Task 1 - Bid Package 5 - Pipeline improvements in Redwood <br /> Shores. <br /> • Expanded Original Task 4 - Bid Package 6 - Peninsula 2 Tank Modification <br /> • Expanded Original Tasks 1,2,3,7 --Additional as-needed technical assistance, <br /> design, and Grant Application support services. <br /> • Expanded Original Task 6 --Services During Construction. <br /> ATTY/AGR/2014/AMENDMENTS/AMEND NO.1 G&E ENGINEERING <br /> REV:03-21-14 VR <br /> Page 3 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.