My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-04-07 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-04-07 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2014 8:30:06 AM
Creation date
4/3/2014 4:51:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
4/7/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.E. - Page 8 <br /> Expanded Task 1: Task 1c - Redwood Shores Pipeline Improvements <br /> Consultant shall develop contract documents to seismically-upgrade the large diameter steel <br /> pipe (backbone steel pipe, 16" to 24" diameter) in and near Redwood Shores. The intent of <br /> these modifications is to install additional isolation valves (about 6 locations) and bypass pipes <br /> (at 10 locations), with the intent to be able to sectionalize the pipe network in Redwood Shores <br /> after a large earthquake, and thus be able to restore service as rapidly as possible to as many <br /> customers as possible. <br /> The work plan below is meant to follow the work as envisioned in the FEMA grant applications. <br /> In other words, the work is tailored to meet the intent of the FEMA grant application, so that the <br /> costs can be approved by FEMA. Should additional work arise during the course of the effort <br /> that is not meant to be funded by FEMA, this work would be addressed under separate <br /> accounts so that Redwood City can readily assign the suitable costs between FEMA-funded and <br /> non-FEMA funded work. <br /> Required Submittals: <br /> 25% Design Submittal <br /> Consultant shall review the locations of all existing Redwood Shores backbone pipe <br /> valve locations. Consultant will use original design drawings for this review. We will <br /> create a map showing these locations, showing the backbone pipes and valve locations. <br /> We will review the available Redwood Shores subsurface boring information and <br /> geologic conditions to rank the relative hazard and pipeline reliability for the backbone <br /> pipe. <br /> Consultant will then walk down each site with these valves in Redwood Shores, to <br /> examine the ease for construction of new bypass pipes and outlets. We will look for <br /> traffic patterns, availability of nearby sidewalks, cross streets and driveways. We will <br /> then prepare a constructability matrix that ranks the ease of construction, relative <br /> difficulty for traffic during construction, and efficacy of the upgrade location with regards <br /> to improving post-earthquake reliability. <br /> We will prepare a report that summarizes the possible locations for installation of new <br /> valves (up to about 6 locations) and bypass pipes (10 locations). We will meet with <br /> Redwood City to discuss these locations (including a drive through) and select the final <br /> locations for implementation. <br /> 50% Design Submittal <br /> We will prepare drawings and specifications for the designs to be implemented of the <br /> type and at the locations agreed to in the 25% submittal. <br /> ATTY/AGR/2014/AMENDMENTS/AMEND NO.1 G&E ENGINEERING <br /> REV:03-21-14 VR <br /> Page 4 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.