My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-04-07 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-04-07 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2014 8:30:06 AM
Creation date
4/3/2014 4:51:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
4/7/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.E. - Page 15 <br /> 3.0 Costs <br /> The not-to-exceed cost to perform the work is included in the table below. <br /> Total Labor <br /> Task Eldinger Duggan Holston Drafting Hours Costs ADCs Total <br /> Description $230.72 $203.94 $182.31 $128.75 <br /> 1c - Redwood <br /> Shores Pipe <br /> Design 86 40 240 300 666 $110,379 $500 $110,879 <br /> 4a - Peninsula 2 <br /> Tank (Pipes) 20 20 60 40 140 $24,782 $200 $24,982 <br /> 4b - Peninsula 2 <br /> Tank (Piles) 60 40 80 40 220 $41,736 $200 $41,936 <br /> Expanded 1, 2, 3 <br /> &7 — Approved <br /> Additional Work - - - - - - - $30,042.00 <br /> Expanded 6 - <br /> Services during <br /> construction (as- <br /> needed) 20 80 80 80 260 $45,814 $1,000 $46,814 <br /> Total $254,653 <br /> ATTY/AGR/2014/AMENDMENTS/AMEND NO,1 G&E ENGINEERING <br /> REV:03-21-14 VR <br /> Page 11 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.