My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-04-07 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-04-07 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2014 8:30:06 AM
Creation date
4/3/2014 4:51:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
4/7/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.E. - Page 16 <br /> 4.0 Project Organization <br /> Mr. John Eldinger will be the Project Manager for this work. He will also be technically <br /> responsible for the work, and will stamp all drawings and specifications. He is a <br /> registered California Professional Engineer and Structural Engineer with 35 years <br /> experience. <br /> Mr. Donald Duggan will lead the design (civil, structural, pipes) effort. He is a registered <br /> California Professional Engineer with 37 years experience. <br /> Ms. Darlene Holston will support the design effort. She is a registered California <br /> Professional Engineer with 32 years experience. <br /> Ms. Pavia Furminkova will provide drafting as part of the design effort. <br /> Resumes are available upon request. <br /> 5.0 Project Schedule <br /> The schedule to perform the work is as follows: <br /> Notice to Proceed April 7 2014 (target date). <br /> Submit draft reports (Tasks 1, 2b) NTP + 2 months <br /> Submit 50% Plans, Specs & Estimates NTP + 3 months <br /> Submit 90% Plans, Specs & Estimates NTP + 6 months <br /> Submit 100% Plans, Specs & Estimates NTP + 8 months <br /> The target schedule is to have construction work for Task 4 & 8 be bid in 2014. <br /> Task 6. It is intended that all construction work on all bid packages (8 total) will be <br /> complete by December 31, 2016. <br /> ATTY/AGR/2014/AMENDMENTS/AMEND NO.1 G&E ENGINEERING <br /> REV:03-21-14 VR <br /> Page 12 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.