My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-04-07 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-04-07 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2014 8:30:06 AM
Creation date
4/3/2014 4:51:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
4/7/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.E. - Page 27 <br /> EXHIBIT "A" <br /> SCOPE OF SERVICES <br /> 1 .0 Introduction <br /> The City of Redwood City has developed a 20-year capital improvement plan for its <br /> water system. As part of that plan, a series of activities are envisioned for seismic <br /> improvements of select items within the water system. <br /> Consultant shall perform the work necessary to produce contract documents for seismic <br /> upgrades of specific items (Tasks 1, 2, 3) listed below, shall evaluate the long term <br /> needs for the Peninsula 1 and 2 tanks (Task 4), and provide engineering support during <br /> bid and construction (Tasks 5 and 6). All described in more detail below. <br /> ATTY/AGR12012.001/G&E ENGINEERING Page 10 of 30 <br /> PPV•f31l1 f1/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.