My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-04-07 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-04-07 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2014 8:30:06 AM
Creation date
4/3/2014 4:51:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
4/7/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.E. - Page 28 <br /> Task Facility Name Item <br /> la Glenlock Tank Flexible overflow pipe <br /> la Glenlock Tank Flexible drain pipe <br /> la Easter Cross Tank Flexible overflow pipe <br /> 1a Easter Bowl Tank Anchor tank <br /> la Easter Bowl Tank Flexible overflow pipe <br /> la Cambridge 1 Tank Modify Pipe Supports <br /> la Cambridge 1 Tank Flexible overflow pipe <br /> la Cambridge 1Tank Flexible drain pipe <br /> la Cambridge 2 Tank Anchor tank <br /> la Wilmington Tank Heavier anchorage <br /> la Wilmington Tank Flexible overflow pipe <br /> la Wilmington Tank Flexible drain pipe <br /> lb Redwood Shores Seismic Reinforcement of 2 Pipes on Bridges <br /> 2 Carson Res Upgrade Roof/Discharge Piping <br /> 3 Peninsula 1 PS Restrain Batteries <br /> 3 Peninsula 1 PS Anchor MCC <br /> 3 Peninsula 2 PS Restrain Batteries <br /> 3 Sequoia 1+2 Tank Install Berms <br /> 3 Carson PS Anchor MCC <br /> 3 Carson PS Restrain Batteries <br /> 3 Carson PS Improve roof diaphragm <br /> 3 Glenlock PS Restrain Batteries <br /> 3 Glenlock PS Anchor MCC <br /> 3 Glenlock PS Restrain Generator <br /> 3 Lakeview Res Restrain pipe <br /> 3 Lakeview PS Restrain Batteries <br /> 3 Lakeview PS Anchor MCC <br /> 3 Lakeview PS Restrain DG Batteries <br /> 3 Cambridge 2 Tank Install curb <br /> 3 Cambridge PS Restrain Batteries <br /> 3 Cambridge PS Anchor MCC <br /> 3 Cambridge PS Improve roof diaphragm <br /> 3 Edgewood PS Restrain Batteries, MCC,Generator <br /> 3 Eagle Hill PS Restrain Batteries <br /> 4 Peninsula 1 Tank Pile review/upgrade <br /> 4 Peninsula 2 Tank Pile review/upgrade <br /> Seismic Improvement Plan <br /> ATTWAGRl2012.001IG&E ENGINEERING Page 11 of 30 <br /> R\l.n 1!1 fl1'7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.