Laserfiche WebLink
7.1.E. - Page 45 <br /> Task JME DMD DOA Drafting FUGRO ODCs Labor Total <br /> $224 $198 $177 $125 $200 <br /> Task 4 Peninsula Tanks <br /> Develop Site Test Plan 8 $1,792 $1,792 <br /> Dig up piles,Site Inspection 12 12 $5,088 $5,088 <br /> 551 Analysis 16 40 80 16 $100 $28,864 $28,964 <br /> Engineering Assessment 12 12 $5,064 $5,064 <br /> Draft Report 8 8 $3,376 $3,376 <br /> Meeting 8 4 $2,592 $2,592 <br /> Final Report 8 2 $2,192 $2,192 <br /> Subtotal Task 4 72 60 80 0 34 $100 $48,968 $49,068 <br /> Task 5.Bid Services 8 8 8 16 7 $200 $7,192 $7,392 <br /> Task 6.Services During <br /> Construction 40 60 60 40 4 $400 $37,260 $37,660 <br /> Totals 272 422 540 398 66 $4,900 $303,014 $307,914 <br /> 1 <br /> ATTY/AGRI2012.001/G&E ENGINEERING Page 28 of 30 <br /> PPw.oi Anil <br />