Laserfiche WebLink
i � � <br /> 2. Several pipe monuments shown on Final Map have not been set, or <br /> cannot be Iocated. <br /> 3. Bench marks required by the Subdivision Ordinance have not been <br /> established. <br /> �. Broken sidewalk at Lot 9, Block 11, has not been replaced. <br /> . Driveway abandoned on Hampton Avenue at Lot 1#.1�., � Block 12, has <br /> not been removed and replaced with standard curb, gutter and sidewalk. <br /> 6. There are accounts outstanding, amounting to more than ��}00.00, which <br /> have not been paid. <br /> 7. Parkway trees have not been planted as per subdivision ordinance. <br /> � <br /> : City Engineer Jain recommended that M. J. King, Inc. , be permitted to make a cash c].eposit of <br /> � <br /> �500.04 to cover furnishing and planting of trees under Park Department supervision when <br /> conditions permit. In order to expedite the acceptanee of these improvemsnts he recommended <br /> that the City Council approve the final acceptance sub�ect to the conditions mentioned above� <br /> '� After discussion, Councilman Stout moved that the final map not be approved until the in- <br /> '� completed items have been corrected, City Clerk"to write �I. J. King informing them of Coun- <br /> cil action. Councilman Granger requested that there �e added to the motion the condition <br /> that subdivision be accepted based upon the report of the Cit� Engineer. Councilman Stout <br /> agreed to this and Councilman Britschgi seconded the motion which carried. Councilman <br /> Britschgi noted that the City Engineer had recently mailed a notice of �.7 items in the <br /> West�rood area which had not been completed. He stated that in fairness to the City <br /> Engineer it should be noted that the contractors have not cooperated in the past. <br /> COUNC�LMAN GRANGER REPORTED ON REPLY FROM T�iE DIVISION OF HIGHWAYS REGARDING THE PLANTIATG OF <br /> REDYVOOD TREES WI�iIN THE ISLAND ON EL CAMIN� REAL at the South City limits. The Engineers <br /> were of the opinion that such trees require a larger area far growth than is allowable in <br /> this island. The�r recornmend further stud9 and endeavor to find loca,tions more favorable <br /> �,,.,, for planting. City Clerk was directed to reply to letter and state the Councilts apprecia- <br /> �,.v� <br /> tion for their cooperation. <br /> MRS. VERA ESKIN PROPOSED A CITY BEAUTTFICATION MASTER P�ING PLAN. This plan would allow plant- <br /> ing in parking aseas. The beautification of such areas would be considered along with park- <br /> ing lots. The C3.ty Clerk was directed to refer this communication to the City Engineer for <br /> further consideration. <br /> DIVISION OF HIGHWAY'S USE OF FAS TAX FUNDS TO PAY C ITY�S SxARE OF CORDILLERAS CREEK CULVERT. Com- <br /> munication received from the Division of Hi�ways authorizing the use of gas tax f�.inds to <br /> pay the City�s 25� of the cost of the Cordilleras Creek culvert to the City of San Carlos <br /> with the understanding that these monies are to be taken from the #30,000.00 already bud- <br /> geted for this project. Communication was ordered filed. <br /> J. L. KRANTZ REQUEST BUILDING PERMIT NORTHEASTERLY CORATER N1AIN & SPRUCE STREETS CONFORMING WITH <br /> PRESENT SET-BACK. The Couneil ,decided to grant the request inasmuch as no official plan <br /> � <br /> lines have been set. Councilman Royer so moved, seconded bg Councilman Granger and <br /> � <br /> c arr ie d. <br /> SYDNEY LEVIN OFFER TO PURCHASE NORTHEASTERLY HALF OF LOT 6, BLOCK B, BOYD AND RENT SUBIDIVISION, <br /> CORNER �dADRONE AND HEMt,OCK. The Real Estate Committee previously inspected this lot and <br /> �""' had placed an appraisal of �850.00. Councilman Royer moved Clerk be directed to adnertise <br /> �, . . <br /> r <br /> � this lot for eale, seconded by Councilman Britschgi and carried. <br /> WESRilIf00D TERRACE IMPROVEMENT CLIIB REGARDING LANDSCAPING HETCH-HETCHY EASEMEATT. The people re- <br /> siding in the area where the Hetch Hetchy right-of-way has been landacaped are ver� pleased <br /> with the results and recommend this procedure be continued throughou� the entire easement <br /> wherever possible. <br />