Laserfiche WebLink
followed as applicable. Provide tie back assembly, unistrut hangers, support <br /> brackets, rail hangers. <br /> C. Provide electrical service to components as required to have a fully <br /> functioning indoor range wireless target carrier system. Electrical work shall <br /> include, but not limited to, four dedicated circuits, one circuit for shooting lane <br /> for new target retriever, four(4) 20 amp dedicated receptacles and one (1) for <br /> each shooting lane to plug new motors into. <br /> D. Provide all nuts, bolts and miscellaneous metals required for mounting of <br /> equipment. Mounting hardware shall be installed in a workmanlike manner <br /> and not interfere with any other equipment. <br /> 3.02 FIELD TESTING <br /> A. Equipment shall be tested to ensure it is fully operational. <br /> B. Provide a manufacturer's technician to startup each unit. The technician shall <br /> be present during the field acceptance testing. <br /> C. Technician shall perform the calibration/adjustments for each unit. <br /> END OF SECTION <br /> 15 <br />